HE Hawaiian Electric Industries 8-K 2026-11-09 slides

The company filed these slides as images. An AI model transcribed each slide from its image, and the summary was written from this transcription. A transcription can contain errors: the slide images in the filing are the authority.

EX-99

55 slides. Original exhibit on SEC.

Figure check: on 8 of 55 slides, figures differ between our transcription and the filing's hidden text. Often the hidden text has glued or stale figures; the slide image is the authority.
  • Slide 7: 0.80, 1.04, 1.15, 1.34, 1.40 only in our transcription; 0.00, 0.50, 0.801, 1.00, 1.341, 1.50, 2.00, 2.50 only in the filing's hidden text
  • Slide 12: 20272026 only in the filing's hidden text
  • Slide 19: 8.5 only in our transcription; 8.52 only in the filing's hidden text
  • Slide 27: 7.0 only in our transcription; 1000, 3000, 4000, 5000, 6000, 7000 only in the filing's hidden text
  • Slide 28: 791 only in the filing's hidden text
  • Slide 32: 0.0, 10.0, 15.0, 20.0, 25.0, 5.0 only in the filing's hidden text
  • Slide 38: 1.0, 100, 120, 140, 2.0, 3.0, 4.0, 5.0, 6.0 only in the filing's hidden text
  • Slide 39: 200, 300, 400, 600, 700 only in the filing's hidden text

Slide 2

Non-GAAP Financial Information

This presentation refers to certain financial measures that were not prepared in accordance with U.S. generally accepted accounting principles, including Core Earnings Per Share (EPS), Core Net Income, Core Return on Equity (ROE) and other Core measures. Reconciliations of those non-GAAP financial measures to the most directly comparable GAAP financial measures can be found in the Appendix herein.

  • See Appendix for definition of Core Earnings, Core EPS and Core Return on Equity (ROE).

Slide 3

Key Takeaways

Track Record of Execution

  • Hawaiian Electric has consistently executed on the objectives communicated since 2023, with each key objective of financial and operational strength moving in the right direction

Positive Trajectory

  • Hawaiian Electric is well-positioned for long-term value creation, with a greatly improved risk profile, near-term catalysts to improved earnings, a favorable regulatory construct, and an elevated capex cycle ahead

Clear Path and Visibility

  • Hawaiian Electric has visibility and a clear plan to achieve a stronger financial foundation through continued execution. Rate rebasing and other regulatory processes, and achieving efficiencies while executing through elevated capex cycle, are expected to lead to stronger credit metrics and returns on equity

Slide 4

Topics of Focus

  1. HEI at a Glance and How We Got Here
  2. Regulatory framework provides steady, predictable revenues, with rate rebasing underway
  3. Implementing industry leading wildfire mitigation efforts and reducing operating risk
  4. Strong balance sheet and liquidity with improving credit metrics
  5. Executing through historic capital cycle

Slide 5

Operating Vertically-Integrated Electric Utility Serving ~95% of Hawaii’s Population

Key Attributes

  • Serving 1.4 million people across five separate grids, with customers including communities, U.S. military facilities, resorts and agricultural operations
  • Operating vertically integrated 100% electric utility with unique Performance Based Regulation framework providing stable, predictable revenues
  • Sales decoupling provides additional revenue stability and predictability
  • Currently in transitional period, with rate rebasing underway for next five-year rate cycle providing revenue enhancement opportunities

HEI callout

  • $1.5 Bn market cap¹
  • $3.5 Bn enterprise value¹
  • Ba2 / B+ / BB- credit ratings²

Hawaiian Electric callout

  • ~$4.1 Bn total rate base
  • ~5,800 sq. mile service territory
  • 1,608 MW owned generation
  • Ba1 / BB- / BB- credit ratings²

Revenues by Customer Class

Customer class Share
Residential 33%
Commercial 32%
Industrial 35%

Rate Base by Company

Company Share
HECO 68%
HELCO 15%
MECO 17%

Revenues by Company

Company Share
HECO 71%
HELCO 15%
MECO 14%

Service-area map labels: Oʻahu, Molokaʻi, Lānaʻi, Maui, Hawaiʻi; Maui Electric; Hawaiʻi Electric Light.

Notes: All data as of December 31, 2025 unless otherwise stated.

  1. As of 11/6/2026. Enterprise value calculated using debt and unrestricted cash balances as of 9/30/26.
  2. Credit ratings from Moody’s, Fitch and S&P, respectively.

Slide 6

Strong Execution on Objectives

Key Objectives Pre-Wildfire (Q2 2023) Post-Wildfire (Q4 2023) Today
✓ Reduce Wildfire Risk No PUC-approved wildfire mitigation plan Wildfire Mitigation Plan in development PUC-approved 2025 – 2027 Wildfire Mitigation Plan being implemented rapidly, and PSPS in place. Significant risk reduction achieved to date
✓ Restore Credit Ratings HEI: NR / BBB+ / BBB-<br>HECO: Baa1 / A- / BBB HEI: B1 / B / B-<br>HECO: Ba3 / B / B- HEI: Ba2 / B+ / BB-<br>HECO: Ba1 / BB- / BB-
✓ Enhance Liquidity $522 million at 2Q 2023 $243 million at 4Q 2023 More liquidity than pre-wildfire; $1,324 million at 3Q 2026
✓ Rebuild Capital Markets Access Full access - $375 million of undrawn revolvers Impaired - revolvers fully drawn, common dividend suspended $558 million equity issuance and a $500 million utility high yield offering executed, with $600 million of undrawn revolvers and $250 million AR facility
✓ Resolve Maui Tort Litigation No wildfire claims outstanding Unquantified claims outstanding First of its kind global settlement signed in record time and upheld by the Hawaii Supreme Court; first $479 million installment paid April 2026, additional $80 million prepaid in Sept. / Oct.
✓ Limit Economic Risk from Wildfires No legislative protections in place Efforts initiated Liability cap legislation enacted, with PUC to establish amount. Wildfire fund study completed and fund deemed warranted (consistent with our view)
✓ Secure Wildfire Cost Recovery No wildfire-specific recovery mechanism None approved $350 million Wildfire Mitigation Program costs approved, with planned securitization to limit customer bill impact
✓ Streamline and Simplify the Business Utility + bank (ASB) + Pacific Current No change Simplified business fully focused on vertically-integrated regulated Utility

STRONG EXECUTION OF STRATEGY, RESULTING IN MEANINGFUL ADVANCEMENT OF EACH KEY FINANCIAL AND OPERATIONAL OBJECTIVE

Slide 7

Delivering on Key Operational Priorities

Improved employee safety and customer satisfaction while advancing wildfire risk reduction and post-wildfire recovery priorities

Best safety metrics on record in 2025 and 2026

52% improvement in TCIR¹ since 2024 (lower is better)

Year Total Case Incident Rate¹ Lost Time Rate²
2015 2.26 1.04
2016 1.67 0.86
2017 1.84 0.88
2018 1.45 0.87
2019 2.17 1.35
2020 1.34 1.03
2021 1.40 1.07
2022 1.70 1.24
2023 1.20 0.66
2024 1.68 1.15
2025 1.08 0.68
2026 YTD 0.80 0.45

Top-tier overall customer satisfaction growth

From 20th to 86th percentile since 2024

Year Residential Customer Satisfaction Score³ Peer Percentile³
2015 61 2
2016 65 4
2017 69 13
2018 69 15
2019 74 52
2020 74 43
2021 77 69
2022 73 41
2023 72 40
2024 67 20
2025 74 56
2026 YTD 77 86

Among industry leaders across broad range of customer satisfaction indicators

  • Of 15 dimensions in national customer satisfaction benchmark survey,⁵ ten were in the top decile for 3Q26
  • Two dimensions rated in 99th percentile for 3Q26: employees and service reputation
  1. Total Case Incident Rate measures how many work-related injuries and illnesses occur per 100 employees. TCIR is calculated as follows: Number of Occupational Safety and Health Administration (OSHA) recordable cases multiplied by 200,000 productive hours (i.e. 2,000 work-hours per year per employee multiplied by 100 employees) divided by total number of productive hours for the year.
  2. Lost Time Rate measures any occupational injury or illness which results in an employee being unable to work a full assigned work shift after an incident per 100 employees. LTR is calculated according to OSHA guidelines as follows: number of Lost Time cases (injury or illness which an employee is unable to work a full assigned work shift as a result of a work-related injury or illness) multiplied by 200,000 productive hours divided by the total number of productive hours for the year.
  3. Customer satisfaction score is the company’s raw score from the Escalent Residential Customer survey. The percentile reflects the percentile compared to peer utilities.
  4. YTD safety figures are as of 9/30/26. YTD customer satisfaction data is an average of scores for the first three quarters of 2026.
  5. Escalent Residential Customer Benchmark Survey of more than 100 utilities.

Slide 8

Addressing Customer Affordability on Multiple Fronts

Initiatives target both energy cost and customer income sides of affordability equation

Financing investments at lower cost

  • Improving credit ratings through risk reduction
  • Securitizing up to $500M of wildfire mitigation, resilience and grid modernization costs (~$2 / month bill impact)
  • Pursuing additional federal funding opportunities, including a DOE loan, to reduce financing costs

Modest rate rebasing request

  • Rate rebasing request seeks recovery of three discrete cost categories, with Company-proposed reduction to manage affordability
  • Phased over two years to moderate bill impact
  • $100 million in realized customer savings to date from PBR

Reducing and stabilizing energy costs

  • Modernizing generation to increase efficiency
  • Adding renewables through competitive procurement to improve bill stability
  • Driving operating efficiency and process improvements
  • All fuels RFP to be launched in late 2026

Increasing customer options and support

  • Helping LMI customers with bill credits, payment plans and pre-disconnection solutions
  • Expanding bill management options, including bill due date choice

Supporting stronger incomes

  • Working with partners on workforce, economic development and affordable housing efforts to help Hawaii families earn more and spend less

Chart: Household energy burden by energy source

Hawaii’s household energy burden is below national average.

Region Total monthly household spending Electricity Natural Gas Rooftop Solar LCOE
U.S. Average 3.32% 77% 22% 2%
Hawaiʻi 2.55% 89% 2% 9%

1. Household energy burden is calculated as household energy spending (retail electricity sales + retail natural gas sales + levelized cost of residential solar) divided by the number of total households, as a % of median household income. 2025 data is the latest currently available as of November 2026.

Slide 9

Topics of Focus

  1. HEI at a Glance and How We Got Here
  2. Regulatory framework provides steady, predictable revenues, with rate rebasing underway
  3. Implementing industry leading wildfire mitigation efforts and reducing operating risk
  4. Strong balance sheet and liquidity with improving credit metrics
  5. Executing through historic capital cycle

Slide 10

Unique Performance-Based Regulatory Model Supports Five-Year Period of Stable, Predictable Revenues

Incremental earnings incentives and opportunities driven by three main sources
Illustrative

Chart category Printed labels and text
Annual Revenue Adjustment (ARA) Annual inflationary adjustment
ARA Spend Baseline O&M & baseline capex
1 — Incremental ARA Earnings ARA spending below inflationary adjustment
2 — Separate Recovery Exceptional Project Recovery Mechanism (EPRM); Innovative pilot projects; Renewable Energy Infrastructure Program (REIP); Z-factor recovery for exogenous events
3 — PIMs Earnings Performance incentive mechanisms
Total Total Earnings; Incremental Earnings Under PBR

No numerical chart values are printed.

PERFORMANCE-BASED REGULATION ALIGNS UTILITY BUSINESS MODEL WITH REGULATOR-APPROVED PRIORITY OUTCOMES

Slide 11

Annual Revenue Adjustments Provide Visibility, With Recovery Mechanism for Exogenous Events

  • Annual target revenues set with ARA during each 5-year Multi-year Rate Period (MRP)

Annual revenue adjustment formula:
i-factor minus x-factor plus z-factor minus customer dividend

i-factor — Accounts for annual inflation

  • Measured by Gross Domestic Product Price Index (GDPPI) from Blue Chip Economic Indicators forecast as of October of each year
  • October 2025 forecast for 2026: 2.8%
  • October 2026 forecast for 2027: 2.8%

x-factor — Productivity factor

  • Initially set at 0% (where it currently remains)

z-factor — Ex post opportunity to recover costs for exogenous events

  • Review and approval determined on case-by-case basis
  • Example: COVID-19-related costs recovered through Z-Factor
  • Potential mechanism for storm cost recovery (e.g., Hurricane Lala)

customer dividend — Three components:

  1. 0.22% adjustment
    ~Compounds over time. 2026 amount is $14.6M.
  2. Management audit savings commitment made in Hawaiian Electric 2020 rate case, approved by PUC at $6.6M annually
  3. ERP benefits returned to Hawai‘i Electric Light and Maui Electric customers. 2026 amount in effect is $3.3M

Slide 12

Rate Rebasing and PBR Review for Second Five-Year Rate Period Progressing

Rate Rebasing Milestones

  • Key procedural milestone complete, with public hearings held on all islands
  • Preliminary PUC schedule allows for a final decision and order in mid-to-late April 2027
    • Awaiting revised procedural schedule, expected in the near term

PBR Review / Redesign Process Nearing Conclusion

  • PBR stakeholder group has continued to meet regularly since 2024
  • Phase 6 will address design of specific PBR mechanisms; Company objectives include modifications to ARA, PIMs and EPRM¹
  • Reflects prior Company input and aligns with the Company’s expectations and planned approaches

PBR Phase 6

Period Milestone
2026 — Oct. 23 Phase 6 commenced with Staff Proposal
2026 — Nov. 13 Parties’ replies to Staff Proposal due
2027 — Early Jan. PUC’s Inclinations on final scope expected, to be followed by a procedural schedule
Continuing into 2027 Collaborative workshops, information requests, statements of position and briefs

Starting from a place of relative alignment, with Staff Proposal focused on many of our own objectives

Proposed Gradual Rate Increases Aligned with Inflation

Category Value
GDPPI adjustment $83.2
Insurance expenses $46.9
O&M reductions $5.1
Total 2027 increase $125.0
2028 Depreciation adjustment $44.8
Total increase requested $169.8

¹ See slide 13 for detailed Company priorities for Phase 6.

Slide 13

Additional Revenue-Enhancing Opportunities Being Pursued in Phase 6

PUC’s Guidance on PBR Phase 6

  • Proceeding to examine specific PBR mechanisms to determine what modifications should be adopted heading into MRP2
  • Stated focus is on Performance Incentive Mechanism (PIM) portfolio, Customer Dividend and collective revenue opportunities offered by i-factor and EPRM¹
    • Phase 6 commencing concurrently with alternative rate rebasing proposal²

Our Phase 6 Objectives Include:

Modifying forecasted GDPPI inflation adjustment

  • Base the inflation adjustment on actual rather than forecasted inflation, and better reflect actual inflationary pressures in our unique island operating environment
  • Use a blended index that incorporates the utility labor cost index

Revising PIM Portfolio

  • Ensure target performance is within the company's control to achieve, and limit number of PIMs to avoid dilution of effort and focus while ensuring PIMs cover core objectives
  • Expand reward potential to fulfill PUC's original intent³ that they provide a meaningful opportunity. Proposing up to 200 bps at risk (downside of 50 bps / upside of 150 bps)

Terminate Subtractive ARA Components

  • Eliminate the Management Audit Savings Commitment and return of ERP Benefits through Customer Dividend

Additional

  • Expand scope of EPRM to allow recovery for large “business-as-usual” costs; Revise approved cost of capital in future EPRM projects to reflect higher risk; Pension and OPEB tracker modifications⁴
  1. As stated in PUC Decision and Order No. 41876.
  2. PUC Order, including a Staff Proposal, issued on October 23, 2026, commencing Phase 6.
  3. Proposed 200 bps structure directly implements PUC staff’s original recommendation for “between three and six PIMs that, in total, would provide the HECO Companies with incentives that would increase or decrease earnings by 150 - 200 basis points.” (Staff Proposal for Updated Performance-Based Regulations, filed on February 7, 2019 in Docket No. 2018-0088).
  4. Modifications contemplated include adding 401(k) costs to the tracker, and eliminating unamortized balances at the end of each calendar year to avoid the need to reset tracker balances for amortization purposes at the end of MRP2.

Slide 14

Topics of Focus

  1. HEI at a Glance and How We Got Here
  2. Regulatory framework provides steady, predictable revenues, with rate rebasing underway
  3. Implementing industry leading wildfire mitigation efforts and reducing operating risk (highlighted)
  4. Strong balance sheet and liquidity with improving credit metrics
  5. Executing through historic capital cycle

Slide 15

Strategic Spending and Investment Support Rapid Reduction of Wildfire and Other Climate-Related Risk in Unique Island Service Territory

TARGETED SPENDING AND INVESTMENT

Over $400 million¹ in 2025 – 2027 spending to reduce wildfire risk and enhance grid resilience in the face of increasingly severe weather events

Category Spending
WMP capital $237
WMP O&M $80
Resilience Program capital $79
Grid Modernization capital $11
Total 2025 - 27 wildfire and resilience spend $407

Wildfire and resilience spending has rapidly reduced risk through technology implementation and operational changes, including Public Safety Power Shutoff program, advanced vegetation management and installation of A.I. cameras and weather stations to monitor conditions

¹ Expected to be recovered primarily through securitization. Resilience program capital expected to be recovered through EPRM.

Slide 16

Accelerated Progression of Wildfire Risk Reduction Efforts¹

Grid Hardening and Redesign

  • Replaced or upgraded 5,072 wood poles
  • Replaced 52.9 miles of overhead copper conductor with stronger aluminum conductor or covered conductor
  • Replaced 16,114 expulsion fuses with firesafe fuses
  • Replaced 4,594 lightning arresters with firesafe lightning arresters

Situational Awareness

  • Installed 135 weather stations along circuits in all high wildfire risk areas, providing key information about wind, temperature and humidity conditions
  • Installed 145 A.I. assisted high-definition video camera stations covering over 99% of high wildfire risk areas across our service territories

Operational Practices

  • Public Safety Power Shutoff program in place since July 2024
  • 24/7 watch office stood up to monitor for potential ignitions and forecast weather events
  • Spotters deployed in risk areas during hazardous weather conditions
  • In risk areas, set circuit breakers to automatically shut off faster when a disturbance is detected; in addition, lines are not re-energized until fully inspected
  • Developed risk maps based on potential of ignition
  • Conducted circuit inspections in high-risk areas

Stakeholder and Community Partnerships

  • Participated in more than 90 in-person and virtual public outreach events on Maui, Molokai, Oahu and Hawaii Island in 2025
  • Shared information through emails and printed mail, on social media and online, working to broaden the accessibility of information regarding critical wildfire safety issues, such as the PSPS program

Callout: Substantial Reduction in Risk of Ignition from Utility Equipment

¹ Includes installations from 1/1/24 through 9/30/26.

Slide 17

Hawaiian Electric’s Risk Profile is Differentiated from California

Hawaiian Electric’s system is a fraction of California’s in size and wildfire-exposed mileage — 622 high-risk T&D miles vs. 74,000 — enabling faster implementation of mitigation measures across its highest risk areas

T&D Miles in High Wildfire Risk Areas (119x)¹

Category Value
Hawaiian Electric 622
6 CA Utilities 74,000

Total T&D Miles² (27x)

Category Value
Hawaiian Electric 9,800
6 CA Utilities 265,000

Service Territory² (Square Miles) (27x)

Category Value
Hawaiian Electric 5,800
6 CA Utilities 156,000

Differentiating Factors

  • Only 6% of Hawaiian Electric's T&D is in high wildfire risk areas, vs. 28% for California utilities
  • Hawaii’s potential fuels are non-native grass and shrub, not coniferous forest
  • Scale is roughly 1/27th of California's system, allowing faster, fuller mitigation coverage

Hawaiian Electric's Wildfire Mitigation Plan has adopted many best practices from other wildfire-exposed utilities, allowing Hawaiian Electric to rapidly reduce risk through operational changes, including fast trip, block auto-reclose, public safety power shutoff (PSPS), proactive vegetation management, and installing AI cameras and weather stations to monitor conditions for PSPS shutoffs

¹ CA Utility Data from 2022 California State Auditor – Electrical System Safety Report
² CA Utility Data from CPUC Undergrounding Programs Description (CPUC Undergrounding Programs Description)

Slide 18

Actions Beyond the Utility Further Reduce Wildfire Risk

EVOLUTION OF HAWAII’S WILDFIRE RISK THE RESULT OF STATE LEADERSHIP, COLLABORATION AND GREATER RESOURCES

New Governor-Directed Actions

  • Check mark: Approved 40 remote automatic weather stations
  • Check mark: Began installations with federal partners, of a total of 80 fire-detection sensors with 24-hour alerting capabilities
  • Check mark: Continued collaborations with federal partners, nonprofit organizations and local communities
  • Check mark: Revamped siren protocols in conjunction with counties

Callout: Whole-of-society efforts reduce statewide wildfire risk

New Legislation

  • Check mark: Act 303: Requires owners / occupants of property located in hazardous fire areas to maintain effective fire breaks and practice other fire prevention activities
  • Check mark: Act 302: Addresses priorities from Fire Safety Research Institute Phase 3 report (Jan 14, 2025)
    • Established formal Office of the State Fire Marshal
    • Statewide risk assessment, oversight of fire code development & enforcement
    • Develops training standards for prevention, inspection & suppression
    • Develops wildfire hazard map identifying risk zones

Greater Financial Resources

  • Check mark: $24.7M in other federal funds and $7M in general funds for hazard mitigation and emergency operations center
  • Check mark: Department of the Hawaiian Homelands added $20M for wildfire response, recovery and prevention measures
  • Check mark: $7.4 million in general funds for fire response and fuels reduction contracts for Division of Forestry and Wildlife
  • Check mark: $10M in general funds for fire and emergency response equipment for Division of Forestry and Wildlife
  • Check mark: $2.4M for fire prevention, erosion control and fire suppression dip tanks on Maui

Slide 19

Unique Legislative and Legal Protections Limit Economic Exposure to Potential Wildfires

Act 258 became law in 2025, acknowledging the importance of “protecting the financial integrity of Hawaii’s electric utilities” and “improving the utility's credit rating and lowering costs passed on to customers”

✓ State law establishes liability cap, with amount currently being determined

  • As directed by Act 258, the PUC is working to determine the amount of an aggregate liability cap on economic damages from future wildfires. The utility’s Wildfire Mitigation Plan, required for asserting the cap, has already been approved by the PUC¹

✓ Wildfire fund determined to be warranted in the future, following establishment of liability cap

  • In 2025, the PUC completed a study examining establishment and implementation of a wildfire recovery fund. The study concluded that, “a wildfire recovery fund is likely warranted in the future,” and recommended that the liability cap be established first, along with conducting an actuarial study to “determine an appropriate size and structure for a wildfire recovery fund.”

✓ Long-standing Hawaii law provides other unique protections

  • State law includes protections against non-economic damages, which often make up the bulk of damages awarded in wildfire cases in other states
  • Hawaii’s “Limitation on pain and suffering” statute states: “Damages recoverable for pain and suffering as defined in section 663-8.5² shall be limited to a maximum award of $375,000; provided that this limitation shall not apply to tort actions enumerated in section 663-10.9(2),³” capping a significant category of damages in personal injury cases

✓ Favorable Supreme Court ruling helps mitigate wildfire liability by limiting subrogation claims against defendants once the underlying claims against those defendants have been settled

✓ Inverse condemnation has not been applied to utilities for wildfires like it has in California

  1. Act 258 requires that the utility, “have a wildfire mitigation plan that is approved by the Commission and shall have sought and received a determination from the Commission that the plan is being implemented on the timeline approved by the Commission.”
  2. Pain and suffering is one type of noneconomic damage and means the actual physical pain and suffering that is the proximate result of a physical injury sustained by a person.
  3. The torts listed in HRS § 663-10.9(2), are: “(A) Intentional torts; (B) Torts relating to environmental pollution; (C) Toxic and asbestos-related torts; (D) Torts relating to aircraft accidents; (E) Strict and products liability torts; or (F) Torts relating to certain motor vehicle accidents. Act 258 became law in 2025, acknowledging the importance of “protecting the financial integrity of Hawaii’s electric utilities” and “improving the utility's credit rating and lowering costs passed on to customers”

Slide 20

Topics of Focus

  1. HEI at a Glance and How We Got Here
  2. Regulatory framework provides steady, predictable revenues, with rate rebasing underway
  3. Implementing industry leading wildfire mitigation efforts and reducing operating risk
  4. Strong balance sheet and liquidity with improving credit metrics
  5. Executing through historic capital cycle

Slide 21

Continued Progress Toward Investment Grade Credit Ratings

Timeline, left to right

  1. Accelerated wildfire mitigation work to reduce risk.
  2. Signed global settlement agreement in Maui wildfire tort litigation.
  3. Capital markets access affirmed and liquidity position strengthened through $558M equity issuance.
  4. Continuing to maintain strong liquidity position.
  5. Hawaii Supreme Court ruling ends the insurers’ efforts to derail the class settlement.
  6. Act 258 (regarding liability cap, securitization and wildfire fund) signed into law.
  7. Wildfire fund study completed, determining that a fund is “warranted”.
  8. Successful RCF upsize and $500M utility high yield offering executed.
  9. Court approval of global settlement agreement achieved.
  10. Rate rebasing to improve ROE, FFO/Debt, Debt/Equity.
  11. Determine liability cap amount as directed by Act 258.
  12. Establish wildfire recovery fund.

Credit ratings

  • Post-wildfire credit ratings¹:
    • HEI: B1 / B / B-
    • HECO: Ba3 / B / B-
  • WE ARE HERE¹
    • HEI: Ba2 / B+ / BB- credit ratings
    • HECO: Ba1 / BB- / BB- credit ratings

Credit-rating scale: Sub investment grade (higher customer cost and risk) → Investment grade (lower customer cost and risk)

Callout: Liquidity and balance sheet management, ongoing wildfire mitigation work, legal process successes following wildfires have supported path back toward investment grade.

¹ Credit ratings from Moody’s, Fitch and S&P, respectively. Post-wildfire ratings reflect ratings at the end of 2023, following two downgrades from S&P and one each from Fitch and Moody’s.

Slide 22

Positive Credit Ratings Trajectory Continues With Recognition of Wildfire Mitigation Plan Progress

  • July S&P upgrade to BB- from B+ acknowledges progress in improving wildfire safety profile
    • Follows Moody’s upgrade in April
  • PUC’s liability cap rulemaking process underway, with liability cap implementation a potential catalyst for further upgrades

Chart: HEI CREDIT RATINGS 2022 – 2026

  • Agencies: Fitch, Moody’s, S&P
  • Series: Utility (solid line); HoldCo (dashed line)
  • Rating bands: Investment Grade (IG); Sub-IG
Fitch Moody’s S&P
AAA Aaa AAA
AA+ Aa1 AA+
AA Aa2 AA
AA- Aa3 AA-
A+ A1 A+
A A2 A
A- A3 A-
BBB+ Baa1 BBB+
BBB Baa2 BBB
BBB- Baa3 BBB-
BB+ Ba1 BB+
BB Ba2 BB
BB- Ba3 BB-
B+ B1 B+
B B2 B
B- B3 B-

The plotted rating points have no printed data labels.

Slide 23

Our Settlement Financing Strategy Focuses on Minimizing Dilution

Annual cash tax benefits realized over time from settlement payment tax deductions decrease the amount of capital to be raised

FUNDING SETTLEMENT OBLIGATIONS – CURRENT EXPECTATIONS¹

Category Value
One 'Ohana Contribution $75
First Payment (2026) $479
Prepayment of Second Payment $82
Addtl. Planned Prepayment of Second Payment (2027) $100
Second Payment (2027) $297
Third Payment (2028) $479
Fourth Payment (2029) $479
HEI Settlement Obligation $1,990

Funding callouts:

  • Reimbursed by insurance
  • Funded by 2024 equity issuance
  • Early payment made in Sept/Oct
  • Planned prepayment using ASB and insurance proceeds
  • To be funded primarily by debt / convertible debt
  • To be funded by mix of capital

¹ Expected financing and timing of payments may change due to capital markets conditions and other factors.
² Company prepaid $80M, which reduced the gross liability by ~$82M due to the prepayment discount.

Slide 24

Topics of Focus

  1. HEI at a Glance and how we got here
  2. Regulatory framework provides steady, predictable revenues, with rate rebasing underway
  3. Implementing industry leading wildfire mitigation efforts and reducing operating risk
  4. Strong balance sheet and liquidity with improving credit metrics
  5. Executing through historic capital cycle

Slide 25

Potential Financial Impacts of Rate Rebasing and Proposed PIMs—Illustrative Revenue Enhancement Opportunities¹

$ millions 2027 (rates effective 5/1/2027) Full 1st Year Run Rate
Rate Rebasing Revenue (revenue impact) Scenarios Provided $83 $125
Utility Core ROE (includes impact of HEI integration costs of 30 basis-points²) 7.3% – 7.8% 8.3% – 8.8%
Additional Potential Revenue Enhancements Potential Value
Contribution from PIMs³ (if 50 basis-points were achieved) after tax $11
Contribution from PIMs³ (if 100 basis-points were achieved) after tax $22
Contribution from PIMs³ (if 150 basis-points were achieved) after tax $33
Penalty from PIMs³ (if 50 basis-points of penalties were assessed) after tax ($11)
  1. The information on this slide is illustrative only and does not constitute guidance, a forecast, or a commitment or target of the Company. It shows hypothetical financial results that would occur if the Public Utilities Commission (PUC) approves, in full and as requested, the Company's pending and proposed rate rebasing and performance incentive mechanisms (PIMs). The PUC may approve, modify, delay, or deny these requests, and actual results could differ materially.
  2. Substantially all holding company employees became Hawaiian Electric employees as of the third quarter 2026, and associated costs previously recorded at the holding company began being recorded at the utility.
  3. Performance Incentive Mechanisms are being evaluated under Phase 6 of the PBR proceeding and subject to PUC approval.

Slide 26

Utility ROE—Our Strategy Sets Path to Improvement

Illustrative scenario assuming full year impact of rate rebasing (excludes potential PIMs)

Chart: Illustrative scenario assuming full year impact of rate rebasing (excludes potential PIMs)

Category Labelled value(s)
Current Utility Core ROE 5.8%¹
Rate Rebasing 3.0%
ARA and Separately Recovered Revenues 1.0%
Taxes and Other Miscellaneous Items 0.3%
O&M, Depreciation, and Return on Rate Base 0.5% - 1.0%
HEI Integration 0.2%
Forecasted Full Year Run Rate ROE 8.8%; 8.3%

Rate Rebasing Request

  • Company’s 5.3% base rate increase request supports critical investments needed to operate a safe, reliable and resilient system while recognizing the affordability challenges customers face in the current inflationary environment

Targeted ARA and Separate Recovery Mechanisms

  • Annual revenue increases cover inflationary pressures in our cost base and additional separately recovered revenues fund new wildfire, resilience, and generation assets.

Taxes and Other Misc. Items

  • Primarily driven by additional tax expense from higher rebasing, ARA, and separately recovered revenues

Targeted O&M, Depreciation, Return on Rate base

  • Operating within the annual revenue adjustment will be a key strategic priority through the second Multi-year Rate Period of PBR, helping company reach its allowed ROE

HEI Integration

  • HEI costs transferred to the Utility in 3Q26 and management continues to focus on driving efficiencies throughout the integration process.

¹ Utility LTM Core ROE as of 9/30/2026 of 5.2% includes year-to-date storm cost impacts of approximately 60 basis-points and HEI integration costs of approximately 10 bps. Excluding only storm costs, utility Core ROE is ~5.8%.

Slide 27

Rate Base Forecast¹

Chart: Consolidated Year-End Rate Base Forecast
Vertical axis: Rate Base ($ millions)

Period ARA Capex Approved Separately Recovered Capex Pending / Not Yet Filed Separately Recovered Capex Rate Base Forecast¹
2024 Actual $3,723 $245 $3,968
2025 Actual $3,845 $254 $4,099
2026E $4,029 $236 $4,265
2027F $4,213 $325 $4,538
2028F $4,342 $317 $4,659
2029F $4,452 $701 $105 $5,258
2030F $4,580 $635 $172 $5,387
2031F $4,739 $1,021 $212 $5,972

Callout: 2026 – ’31 CAGR: 7.0%

  1. Note: Figures are net of contributions in aid of construction (CIAC) and capital planned to be financed by securitization. 2026 – 2031 rate base includes separately recovered capex (through the EPRM, REIP, and MPIR mechanisms).

Slide 28

Safety, Reliability and Resilience Drive Capital Investment

Capital Expenditures Forecast ($ in millions)

  • Capex supports strategic objectives of reducing wildfire risk, increasing reliability and resilience and repowering firm generation
  • Approval of securitization will shift wildfire spend and reduce the capital forecast
Year ARA Recovery Separate Recovery Wildfire and Resilience Capex Total Capex label Total Capex (incl. securitization capex) Total Capex (excl. securitization capex)
2024A $236 $32 $79¹ $347
2025A $247 $34 $87 $368
2026E $400-$425 $230-$250 $70-$75 $700-$750
2027E $375-$425 $200-$250 $675-$800 $575-$675
2028E $375-$425 $350-$400 $775-$925 $725-$825
2029E $375-$425 $325-$425 $700-$850
2030E $375-$425 $225-$325 $600-$750
2031E $375-$425 $225-$325 $600-$750

Note: Capital expenditure figures are net of contributions in aid of construction (CIAC).

  1. $71 million of 2024 wildfire mitigation costs are classified as ARA recovery, but are included in this bar for comparison purposes

Slide 29

Wildfire Mitigation Plan (WMP) Costs Approved

  • Securitization Ensures Critical Work Done at Least Cost to Customers

Chart: Total WMP Costs Approved

Category Value
Capital $270
O&M $80
Total WMP Costs Approved $350

Chart: WMP Costs by Category

Category Value
Grid Hardening $240.5
Operational Practices $82.7
Situational Awareness $18.5
Other¹ $8.6
Total $350M
  • EPRM approval ensures cost recovery, with securitization planned to minimize bill impact
    • Approved cost covers capital and O&M
    • Additional approval received for recovery of up to $11.5 million of 2025 WMP O&M², and $3.9 million of annual ongoing WMP O&M in 2028+
  • Affordability remains our focus, and planned securitization ensures customer affordability while allowing critical investments to continue
  1. Includes costs for wildfire risk analytics, strengthening stakeholder and community partnerships, and wildfire management and governance.
  2. $11.5 million of estimated incremental 2025 O&M was approved by the PUC for deferral and subsequent recovery. The utility’s incremental 2025 O&M incurred was $9.6 million, which was recorded to a regulatory asset as of December 31, 2025. The utility will therefore recover the actual expenses incurred of $9.6 million.

Slide 30

Planned Resilience and New Generation Support Significant Grid Investment Opportunities

Holistic planning to deliver safety, reliability, resilience, affordability

  • Competitive procurements
  • WMP implementation
  • Invest in modern, resilient grid
  • Foster distributed generation

Strengthen Grid for Resilience, Public Safety and Decarbonization

  • ✓ $1.3 billion in investments through 2035 to build or expand interconnection points between renewable projects
  • ✓ ~$60 million of investments in distribution upgrades over the next 10 years
  • ✓ $190 million over the next 5-years for climate adaptation program¹

Meet Growing Energy Needs and Modernize Generation Fleet

  • ✓ Retiring aging power plants sooner by accelerating addition of modern firm generation
  • ✓ Launching one of the largest competitive procurements in state history
    • ~1,650 GWh of variable renewable energy, 465 MW of grid forming resources, and 111 MW of firm generating capacity
  • ✓ RFP for all fuels (liquids and gaseous) filed by the end of 2026
  • ✓ Continued progression of Stage 3 RFP projects (4 PPAs now approved, 7 pending)

Significant grid investment required to accommodate generation additions

¹ Supported by grant for $95 million in federal funds, officially awarded on August 7, 2024.

Slide 32

Solid Liquidity and Improving Credit Metrics Support Strong Financial Position and Path Back to Investment Grade

ACTIONS FOLLOWING WILDFIRES HAVE ENSURED FINANCIAL STRENGTH

Quarter-end Liquidity ($ millions)

Period Total liquidity
2Q 2023 $522
3Q 2023 $403
4Q 2023 $243
1Q 2024 $257
2Q 2024 $463
3Q 2024 $1,165
4Q 2024 $1,153
1Q 2025 $1,232
2Q 2025 $910
3Q 2025 $1,611
4Q 2025 $1,572
1Q 2026 $1,506
2Q 2026 $1,339
3Q 2026 $1,324

Legend: HECO RCF; HECO ABL; HEI RCF; HEI ATM; Cash & cash equivalents.

S&P ADJUSTED FFO/DEBT¹ ON POSITIVE TRAJECTORY

S&P Adjusted FFO/Debt (%)

Year HEI Consolidated HECO HECO (excl. settlement) HEI Consolidated (excl. settlement)
2021 17.0 21.1 — —
2022 17.5 22.8 — —
2023 14.1 23.8 — —
2024 9.3 11.1 19.7 15.5
2025 11.4 12.8 23.3 19.9

CONTINUING TO TARGET INVESTMENT GRADE CREDIT METRICS WHILE FINANCING REMAINING SETTLEMENT PAYMENTS

¹ All adjusted FFO/debt figures are as of year-end, and as reported by S&P.

Slide 33

Maintaining Solid Liquidity and Financial Strength Through Transitional Year

LIQUIDITY UPDATE

  • As of 9/30, the HoldCo and Utility had $48 million and $176 million of unrestricted cash on hand, respectively. $1.1 billion in additional liquidity is available from the ATM program ($250 million), utility accounts receivable-backed credit facility ($250 million) and corporate credit facility capacity ($600 million)
    • Strong liquidity positions company well in environment of significantly higher fuel costs
    • No meaningful increase in bad debt expense or net write offs despite impacts of higher fuel prices
  • Utility declared $11 million dividend to HEI for the third quarter

FINANCIAL POSITION REMAINS STRONG IN HIGH FUEL PRICE ENVIRONMENT

Period Bad debt expense ($ millions) Net write off (%)
Q3 2025 $1.0 0.11%
Q4 2025 $0.7 0.13%
Q1 2026 $0.4 0.14%
Q2 2026 $0.7 0.14%
Q3 2026 $0.6 0.12%

Slide 34

Utility LTM ROE

ROE (%)

Category ROE (%)
Allowed ROE 9.5%
Non-recoverable items¹ (0.6%)
ROE less Structural Items 8.9%
Actual O&M, depreciation & return on rate base over recovery² (2.9%)
Others, Net (0.8%)
Actual Q3 LTM 2026 Core ROE 5.2%

Callout: Includes approximately (60) bps impact from storm costs²

GAAP TO NON-GAAP RECONCILIATION OF UTILITY LTM ROE⁶ ($ in millions)

9/30/2026 9/30/2025 12mo Simple Average 9/30/2026
GAAP Common Stock Equity $1,908.8 $1,548.6 $1,728.7
(less):
GLST-1³ - (287.3) (143.6)
HEI equity infusion related to wildfire claims payment (470.2) - (235.1)
Maui wildfires⁴ 1,326.7 1,416.1 1,371.4
Core Simple Average Common Stock Equity 2,721.3
Non-GAAP (Core) Net Income $141.6
Core ROE⁵ 5.2%
  1. Includes incentive compensation, advertising and charitable contributions.
  2. Includes 60 bps impact from total O&M storm-related costs (~$23.0 million pre-tax) based on preliminary estimates as of September 30, 2026 and are subject to change. Incremental costs that are expected to be deferred (to be followed by a subsequent request for recovery) is estimated to range between approximately 75%-85% of the total O&M storm-related costs, which is currently estimated at approximately $19.3 million.
  3. Equity interest of GLST-1 was assigned by HEI on June 30, 2025 and adjusted down to nil after the first installment payment was made in the second quarter of 2026.
  4. Life-to-date Maui wildfire related expenses, net of insurance recoveries and approved deferral treatment.
  5. Non-GAAP (Core) Net Income / Core Simple Average Common Stock Equity.
  6. Columns may not foot due to rounding.

Slide 35

3Q 2026 Financial Performance & Highlights

GAAP Results Include Wildfire and Pacific Current Expenses¹

3Q 2026 Earnings EPS
Net Income (GAAP) $35.5M $0.20
excl.: Maui wildfire-related expenses $14.0M $0.08
excl.: Gain on sale of investment and net unrealized gain on investments ($64.1M) ($0.37)
excl.: Loss from Pacific Current asset impairments $37.7M $0.22
Core $23.0M $0.13

3Q Core EPS¹

Year Utility Holding Co. & Other Total
2025 $0.23 ($0.04) $0.19
2026 $0.16 ($0.03) $0.13

HEI Consolidated Year-on-Year Variance—Core Net Income²
($ in millions)

Category Value
Q3 2025 $32.8
Other segment loss³ $2.2
Revenues³ $7.0
Tax Adjustments⁵ $2.0
Other⁵ $0.5
O&M⁷ $16.8
Interest expense⁸ $3.3
Fossil fuel cost risk share adj $1.4
Q3 2026 $23.0
  1. Columns may not foot due to rounding.
  2. See appendix for reconciliation of “Core” metrics to the equivalent GAAP metric.
  3. Includes reduction of costs due to HEI integration cost transferred to the utility of $4.2M (After-tax), net of lower interest income due to 1st installment payment.
  4. Includes ARA revenues, PIMS and impact from worse heat rate performance.
  5. Return to Provision adjustment, net of Uncertain Tax Provision.
  6. “Other” consists primarily of higher depreciation, partially offset by AFUDC.
  7. Includes higher storm response and IMT costs of $11.6M (After-tax), HEI integration costs of $4.2M (After-tax), and higher other O&M, partially offset by lower WMP costs.
  8. Includes higher interest expense of $3.4M, net of $0.1M in investment interest income.

Slide 36

3Q Adjusted O&M Excluding Pension (non-GAAP)¹

$ in millions

Period Adjusted O&M
3Q25 $139.8
3Q26 $158.9

GAAP TO NON-GAAP RECONCILIATION OF O&M, NET OF EXCLUSIONS²

3Q 2025 3Q 2026
GAAP O&M $161.8 $181.6
(less):
Pension¹ 12.6 11.3
Covered by surcharges 5.9 5.4
Covered by third parties 3.5 6.0
Adjusted O&M $139.8 $158.9
  1. Includes other post-employment benefits and excludes pension nonservice retirement benefits.
  2. Columns may not foot due to rounding.

Slide 37

YTD Adjusted O&M Excluding Pension (non-GAAP)¹

$ in millions

YTD Adjusted O&M Excluding Pension (non-GAAP)¹

Period Adjusted O&M
YTD3Q25 $398.1
YTD3Q26 $441.8

GAAP TO NON-GAAP RECONCILIATION OF O&M, NET OF EXCLUSIONS²

YTD 3Q 2025 YTD 3Q 2026
GAAP O&M $463.1 $510.5
(less):
Pension¹ 36.9 34.5
Covered by surcharges 16.6 16.0
Covered by third parties 11.4 18.2
Adjusted O&M $398.1 $441.8
  1. Includes other post-employment benefits and excludes pension nonservice retirement benefits.
  2. Columns may not foot due to rounding.

Slide 38

Hawaiian Electric Crews Responded Rapidly Despite Hurricane Lala’s Severity

  • Hurricane Lala caused extensive statewide damage as it passed through the southern portion of the island chain August 14–16
    • Severity of damage resulted in Presidential emergency declaration signed August 25
  • Hawaiian Electric crews responded rapidly
    • Although outages, at their peak, impacted over 40% of customer accounts across the utility’s service territories, utility crews made rapid progress restoring service, with more than 95% of affected customers restored by August 19
  • Hawaiian Electric is strengthening the grid while repairing damage
    • As storm-damaged power lines are replaced, the utility is strengthening the electric system where possible
    • In high wildfire risk areas, copper wire is being replaced with aluminum wire during restoration and repair work
  • O&M impact from Hurricane Lala estimated at ~$14 million¹. Lala O&M, along with O&M from other storms in the third quarter and the Kona Low storms earlier in the year, totals approximately $23 million¹
    • Approximately $19 million¹ of the total storm O&M is estimated as incremental and potentially eligible for recovery
  • The Company filed an application on October 21, 2026 requesting deferral accounting treatment for qualifying incremental storm costs, and expects to seek recovery separately once costs are finalized.

Chart: Efforts of Hawaiian Electric crews resulted in accelerated restoration despite severe damage

Period % of statewide customers affected
16-Aug 41.6%
17-Aug 24.7%
18-Aug 7.8%
19-Aug 4.1%
20-Aug 2.8%
23-Aug 1.4%

¹ The amounts presented reflect management's estimates as of September 30, 2026 based on information currently available. Actual total costs may differ materially from these estimates and such estimates do not factor in potential insurance coverage. Whether, and to what extent, the Company defers storm costs as a regulatory asset and ultimately recovers from customers depends on a review and approval by the PUC. The Company can give no assurance that recovery will be authorized, or that it will be authorized in the amounts, on the timeline, or on the terms requested. A disallowance or delay could have a material adverse effect on the Company's financial condition, results of operations, and cash flows.

Slide 39

Long-term Debt Maturities (as of 9/30/26)

Debt Maturity Schedule by Entity ($ in millions)
Y-axis: Maturing Amount ($)

Year HEI¹ HECO (HECO + HELCO + MECO)
2026 11
2027 5 100
2028 77 68
2029 5 35
2030 24 150
2031 34
2032 44 100
2033 28 608
2034 13 50
2035 0
2036 0
2037 140
2038
2039 150
2040 45
2041
2042 150
2043 70
2044
2045 80
2046 40
2047 50
2048 15
2049 80
2050 120
2051 7
2052 7
2053 20
2054
2055

Callout: Includes $500M HY debt maturity

¹ Includes ~$49 million of Mahipapa (previously classified as held for sale)

Slide 40

Safety, Reliability and Resilience Drive Capital Investment

Capital Expenditures Forecast Detail ($ in millions)

Status Key Capex Projects¹ 2024 Actual 2025 Actual 2026 Forecast 2027 Forecast 2028 Forecast 2029 Forecast 2030 Forecast 2031 Forecast Recovery Mechanism
Approved Waiau Repower $1 $143 $149 $242 $223 $96 $119 EPRM/Securitization
Approved Wildfire Mitigation Plan (WMP) Program² $71³ $64 $76 $92 $70 $64 $64 $64 EPRM/Securitization
Approved WSS Securitization Reimbursement ($92) ($67) ($24) ($19) Securitization
Approved Grid Modernization Phase 1 $12 MPIR
Approved Resilience Program $8 $23 ($4)⁴ $30 $13 $6 EPRM
Approved Army Privatization $9 $11 $26 $50 $73 $39 $22 $18 Contractual
Approved Waena BESS + PV Project $6 $13 $88 $13 EPRM
Approved 100% CIAC / Other $5 $9 ($6) ($18) $32 $33 $45 $29 EPRM/REIP/Other
Sub-Total $111 $121 $323 $224 $363 $341 $208 $230
Awaiting PUC approval or to be filed Grid Modernization Phase 2 (GMS2) $11 $29 $25 $25 $17 EPRM/Securitization
Awaiting PUC approval or to be filed GMS2 Securitization Reimbursement ($11) ($29) Securitization
Awaiting PUC approval or to be filed EV Expansion Programs $2 $3 $5 $6 EPRM
Awaiting PUC approval or to be filed Other Separately Recovered Major Projects $4 $17 $47 $74 $55 EPRM/REIP/Other
Sub-Total $4 $19 $75 $104 $78
ARA recovery Baseline Capex $236 $247 $400-$425 $375-$425 $375-$425 $375-$425 $375-$425 $375-$425 ARA
Total Capex - excl. Securitization Capex $347 $368 $700-$750 ~$575-$675 ~$725-$825 ~$700-$850 ~$600-$750 ~$600-$750
Total Capex - incl. Securitization Capex ~$675-$800 ~$775-$925

Note: Capital expenditure figures are net of contributions in aid of construction (CIAC).

  1. Key projects listed may not sum to capex range shown on bar chart due to rounding.
  2. Separate recovery /securitization applies to capex after Jan 1, 2025 and to expense after May 1,2025.
  3. 2024 Wildfire Mitigation Costs are classified as ARA recovery, but are included in this line for comparison purposes.
  4. $30.3M in forecasted capex spend for 2026, net of forecasted IIJA reimbursement of $34.5 million.

Slide 41

Fossil Fuel Cost Risk Sharing

  • Symmetrical mechanism
  • Variations in fossil fuel price above or below baseline shared 98% customers / 2% utility
  • Applies to utility fossil fuel generation (not IPP generation or non-fossil fuels), includes fuel efficiency impacts
  • Baseline price: January fuel prices for each fossil fuel type
Hawaiian Electric (Oahu) Hawaii Electric Light (Hawaii Island) Maui Electric (Maui County)
Annual upside / downside cap +/-$2.5 million +/-$600,000 +/-$633,000
January 2026 fuel price ($ per bbl)
Low Sulfur Fuel Oil (LSFO) $94.82
Intermediate Fuel Oil (IFO) $79.93 $76.76
Diesel $107.72 $110.35 $111.18

Slide 42

Status of Key Open Dockets

Subject and Description Docket # Latest Developments Next Milestone
Performance-Based Regulation<br>Proceeding to evolve regulatory framework to better align with customer interests and state clean energy policy 2018-0088 Beginning in 2024, this docket has focused on (a) whether - and if so, by what process - the utility’s rates should be rebased before the beginning of the next PBR multiyear rate period to commence in 2027 (“MRP2”), and (b) whether modifications to the PBR Framework were warranted for MRP2. On 2/27/2025, the PUC issued an order establishing that the utility may rebase rates with a 2026 test year consolidated rate case type proceeding. On 8/13/2025, the PUC issued an order providing process guidance for development of proposed PBR Framework modifications (PBR proceeding “Phase 6”), including potential party-proposed changes to the Annual Revenue Adjustment (“ARA” mechanism, EPRM mechanism and the PIMs portfolio).<br><br>On 8/28/2025, the utility filed a request to extend the time to file a rate case to allow collaboration among the PBR Working Group parties on an alternative rate rebasing proposal that could eliminate the need for a general rate case application and process. The PUC approved the request on 9/29/25 and noted that if the parties were unsuccessful in developing an alternative rebasing proposal, or if such a proposal were submitted and rejected by the PUC, the utility can file a 2027 test year rate case type proceeding in the second half of 2026. The PUC also noted that, depending on outcome of the alternative rate rebasing process, the PUC may defer the start of MRP2 beyond January 2027.<br><br>On 3/6/2026, the utility filed an alternative rebasing proposal jointly with PBR Working Group party Ulupono Initiative. The rebasing request proposed an increase in revenues of $170 million, which represents a consolidated increase of 5.3% compared to total operating revenues at current effective rates.<br><br>In an order issued on 6/15/2026, the PUC directed the utility to re-submit its request for an increase in its revenue requirement, with supporting materials, in the form of a new application, and established a tentative procedural schedule for the new proceeding. On 6/25/2026, the utility’s filed a motion for reconsideration of the PUC’s 6/15/2026 order regarding the rejection of the utility’s reservation of rights provision and the procedural schedule established in the order.<br><br>On 10/23/26, the PUC issued an order that introduced a proposal prepared by PUC staff, which identified possible modifications of certain PBR mechanisms in preparation for MRP2 (Staff Proposal). The PUC stated that the Staff Proposal is intended to be a starting point for discussion among the PBR Parties, which may result in further modification(s) of mechanisms or development of entirely different mechanism structures. To facilitate an open discussion, the PUC instructed the PBR Parties to file initial comments regarding the Staff Proposal by November 13, 2026. Order from the PUC addressing the utility’s motion for reconsideration of the PUC’s 6/15/2026 order.<br><br>Phase 6 of the PBR proceeding is in process and will vet and fully develop modifications to the PBR Framework for MRP2. Following consideration of the PBR Parties’ replies on the Staff Proposal, the PUC anticipates issuing an order by early January 2027, outlining its inclinations on some or all of the PBR mechanisms discussed in the Staff Proposal to provide guidance regarding the PUC’s priorities for the remainder of these proceedings. The PUC then plans to host a workshop with the PBR Parties, followed by Parties filing statements of position, a discovery period, a second workshop, an evidentiary hearing, and a briefing period. The dates for these procedural steps will be determined by the PUC.
Alternative Rebasing 2026-0162 In accordance with the PUC’s order in Docket No. 2018-0088, the utility filed its application for approval of its rebasing proposal on 7/17/2026. The PUC held public hearings regarding the utility’s application on the islands of O‘ahu, Maui, Lānaʻi, Molokaʻi, and Hawai‘i Island in late September through early November. Awaiting a procedural schedule from the PUC for review of the utility’s application for approval of its rebasing proposal.

Slide 43

Status of Key Open Dockets, Continued

Subject and Description Docket # Latest Developments Next Milestone
Stage 3 RFP<br>Hawaii Island seeks up to 325 GWh of energy annually and up to 65 MW of capacity. Oahu seeks at least 965 GWh of energy annually and 500-700 MW of firm capacity. Maui seeks at least 425 GWh of energy annually and at least 40 MW of firm capacity. 2017-0352 Stage 3 RFP<br>On 12/30/2024, PPA were executed for AES’s Keamuku (86 MW PV and 86 MW / 344 MWh BESS on Hawaii Island) and Kuihelani Phase 2 (40 MW PV and 40 MW / 160 MWh BESS on Maui) projects. On 3/25/2025 a PPA was executed for Ameresco’s Puuloa Solar project (6 MW / 30 MWh BESS on Oahu). Applications for PUC approval were filed for all three projects; however, the PUC dismissed all three without prejudice pending resubmission upon completion of the IRS. Kuihelani Phase 2 was re-filed on 12/23/2025, and Puuloa Solar was re-filed on 12/19/2025. On 11/24/2025, a PPA was executed for Mahi Solar (40 MW / 120 MWh BESS on Oahu) and an application for PUC approval was filed on 11/26/2025. On 9/22/2025 a PPA was executed for Ameresco’s Ukiu Energy project (40 MW firm generation facility on Maui) and an application for PUC approval was filed on 9/26/2025. On 11/12/2025, the PUC suspended the docket and instructed the utility to detail the project’s compliance with the Hawaii Environmental Policy Act and demonstrate that environmental review for the project is not required by HRS Chapter 343-5.<br><br>On 3/11/2026, the utility filed its Amended and Restated (A&R) PPA executed by the utility and Ukiu Energy LLC and other matters relating to the 40 MW firm dispatchable capacity and energy. On 3/25/2026, the PUC issued an order that lifted the suspension of this docket. On 5/21/2026, an A&R PPA for Keamuku was executed and an application for PUC approval was filed on 5/29/2026. On 5/21/2026, an A&R PPA for Kaheawa Wind Power (30 MW wind) was also executed and an application for PUC approval was filed on 5/29/2026. On 5/26/2026, 6/16/2026, and 6/24/2026, the PUC approved the PPAs with Mahi Solar, Puuloa Solar, and Kuihelani Phase 2, respectively. Additionally, on 8/31/2026, an application for PUC approval for an A&R PPA with Kalaeloa Partners, L.P. was filed, which is a 208 MW of firm capacity on Oahu and is the largest PPA under the Stage 3 RFP. On 9/30/2026, a PPA for Pulehu Solar (20 MW / 80 MWh BESS on Maui) was executed and an application for PUC approval was filed on 10/5/2026, The Companies continue to advance the remaining selected projects through negotiations and execution and the PUC approval process. Stage 3 RFP<br>Contract negotiations ongoing; PUC approvals pending.

Slide 44

Status of Key Open Dockets, Continued

Subject and Description Docket # Latest Developments Next Milestone
2025-2027 Wildfire Mitigation Plan (2025-2027 WMP) 2025-0156 On 12/31/2025, the PUC issued Decision and Order No. 42228, which (1) approves the utility’s WMP, (2) provides instructions for updating the WMP for 2026-2027, and (3) establishes Areas for Continued Improvement that the utility is required to meet for its 2026-2027 WMP update and next iteration of its WMP for 2028-2029.<br><br>On 4/13/2026, the utility filed the 2026-2027 WMP Update.<br><br>On 6/15/2026, the PUC issued an order regarding the updated Procedural Schedules that shall govern the review of utility’s: (1) Compliance with year 2025 of its WMP; and (2) 2026-2027 WMP Update.<br><br>On 7/31/2026, the PUC issued an order which establishes a fourth track to evaluate Updated Guidelines for Hawaiian Electric’s future WMPs, starting with the 2028-2029 WMP.<br><br>On 9/1/2026, the Consumer Advocate filed its Statement of Position on the Companies’ 2026-2027 WMP Update (Track 2). The Consumer Advocate recommends that the Commission approve the 2026-2027 WMP Update, subject certain recommendations.<br><br>On 9/9/2026, the Company, the Consumer Advocate, and Life of the Land filed their respective Statements of Position regarding Track 4 WMP Guidelines.<br><br>On 9/15/2026, the Company filed its Reply Statement of Position regarding the WMP 2026-2027 Update (Track 2).<br><br>On 9/24/2026, the Commission issued an order to revise the Track 3 (2025 WMP Compliance) Procedural Schedule. The Commission notes that sequencing the remaining Track 3 milestones after the Track 2 and Track 4 milestones allows the Commission to complete its review of the Company’s information request responses and any subject matter expert interviews before issuing the Preliminary Compliance Assessment, and preserves the time provided for the Parties and LOL to consider that assessment in their Statements of Position.<br><br>On 10/12/2026, the Company and the Consumer Advocate filed their respective Reply Statements of Position regarding Track 4 WMP Guidelines. Track 2 (WMP 2026-2027 Update)- Pending PUC Order<br><br>Track 3 (2025 WMP Compliance)- PUC 2025 WMP Compliance Assessment extended to Nov 20. Consumer Advocate and LOL Statement of Positions are due Dec 7. HECO Reply Statement of Position due Dec 22.<br><br>Track 4 (WMP 2028-2029 Guidelines)- Pending PUC Order

Slide 45

Status of Key Open Dockets, Continued

Subject and Description Docket # Latest Developments Next Milestone
2026-2027 WMP Update Exceptional Project Recovery Mechanism (EPRM) 2026-0221 On 10/1/26, the utility filed an application requesting approval to recover, through the EPRM, $30.5 million in incremental O&M expenses from 2027- 2029 and $4.8 million annually thereafter (plus 3% escalation), necessary to implement the Areas for Continued Improvement (ACIs) that the PUC directed be incorporated into the 2026-2027 WMP Update. The utility intends to not effectuate cost recovery for any approved costs through the EPRM until the PUC has issued an order addressing the utility’s application for a financing order pursuant to HRS §269G-2. Awaiting a procedural schedule from the PUC for review of the utility’s application
Securitization Financing 2026-0235 On 10/9/26, pursuant to HRS Chapter 269G, the utility filed an application requesting PUC approval of a financing order authorizing the issuance of bonds to finance infrastructure resilience costs. The utility seeks to finance through securitization approximately up to $350 million for the 2025-2027 WMP, $31 million for the 2026-2027 WMP Update, additional costs for the 2028-2029 WMP, $121 million for Grid Modernization Phase 2, and upfront financing costs, limited to project costs that are incurred first in accordance with HRS § 269G-2(b)(2). Awaiting a procedural schedule from the PUC for review of the utility’s application
Storm Deferral 2026-0245 On 10/21/26, the utility filed an application to defer storm restoration costs. The utility requested to approve deferred accounting treatment for costs incurred in connection with the utility’s response and restoration efforts arising from (1) the Kona Low Storms and (2) a separate extraordinary period of tropical cyclone activity in the fall of 2026 that included Hurricanes Lala, Lowell, Nolo. The requested deferral period would extend through December 31, 2026. The utility requested PUC approval by December 15, 2026. Awaiting a procedural schedule from the PUC for review of the utility’s application
Integrated Grid Planning-Second Cycle (IGP)<br>Next phase of long-range planning, combining planning and procurement of traditional and non-traditional resources 2026-0001 On 1/2/2026, the PUC issued an order to open the second cycle of IGP. By 1/31/2026, the PUC ordered the utility to file (1) a Second Cycle Workplan in this docket, and (2) an initial inputs-and-assumptions package. On 3/2/2026, the utility filed its Second Cycle Workplan and initial inputs-and-assumptions package for PUC and stakeholder review.<br><br>On 6/30/2026, the utility filed its IGP Action Plan Annual Update. On 7/17/2026 the utility requested that the PUC open a new proceeding to review and approve an RFP for ~500 MW of fuel flexible firm generation on Oʻahu, to be administered concurrently with the utility’s IGP RFP. On 8/5/2026 the PUC responded, informing the utility that a demonstration of need must be made before advancing a procurement of this size.<br><br>On 9/15/2026, the Companies submitted the IGP Second Cycle Inputs and Assumptions and Grid Needs Assessment Methodology for Commission and stakeholder review. On 9/28/2026, Life of the Land filed a motion to establish a dedicated storm-hardening and multi-hazard resilience track in IGP Phase 2. On 9/28/2026, the Company filed a Memorandum in Opposition to Life of the Land’s motion. TBD

Slide 46

How Do Separate Recovery Mechanisms Work?

  • EPRM: Provide specific revenue requirements for each project. Revenues are accrued with minimal lag, starting the first day of the month following project completion
    • Total revenue requirement (RR) for each project consists of a capital revenue requirement and an expense revenue requirement
    • RR = O+T+D+r(RB); Operating expenses + taxes + depreciation + return on rate base
  • Pilot Projects: Intended to foster innovation by establishing an expedited implementation process for pilots that test new technologies, programs and business models. The utility can submit specific proposals and the PUC will target issuing a decision within 45 days, otherwise the proposal is considered approved as submitted
    • Allows utility to defer and recover total annual expenditures, subject to an annual cap of $10M, over twelve months

Slide 47

PBR Timeline – Key Annual Dates and Reports

Report Filing date Key content relevant to projecting utility’s financials
Fall Revenue Report (Preliminary) October 31 Target revenues including:<br>• RBA Balance as of September 30, effective January 1 of the following year<br>• ARA for 2027 using GDPPI projections (October Blue Chip)<br>• Any actual and known revenue adjustments (not estimates)
January 1 Effective date of approved target revenues
MPIR/EPRM, PIM & Pilot Project Update February 28* • Schedules/workpapers for all known attained PIMs/SSMs & MPIR/EPRM revenue adjustments<br>• Pilot Project Update report
Spring Revenue Report (Comprehensive) March 31 • Actual PIM performance from previous year<br>• MPIR/EPRM adjustments<br>• ESM adjustments<br>• Any approved Z-factor costs<br>• Any approved Pilot Project costs
June 1 Effective date of approved target revenues including adjustments from the Spring Revenue Report

*Utility’s annual Pilot Update and annual PIM/SSM Performance Review due by March 31.

Slide 48

Cautionary Note Regarding Forward Looking Statements

This report and other presentations made by Hawaiian Electric Industries, Inc. (HEI) and Hawaiian Electric Company, Inc. (Hawaiian Electric) and their subsidiaries contain “forward-looking statements,” which include statements that are predictive in nature, depend upon or refer to future events or conditions and usually include words such as “will,” “expects,” “anticipates,” “intends,” “plans,” “believes,” “predicts,” “estimates” or similar expressions. In addition, any statements concerning future financial performance, ongoing business strategies or prospects or possible future actions are also forward-looking statements. Forward-looking statements are based on current expectations and projections about future events and are subject to risks, uncertainties and the accuracy of assumptions concerning HEI and its subsidiaries (collectively, the Company), the performance of the industries in which they do business and economic, political and market factors, among other things. These forward-looking statements are not guarantees of future performance and actual results and financial condition may differ materially from those indicated in the forward-looking statements.

  • Risks, uncertainties and other important factors that could cause actual results to differ materially from those described in forward-looking statements and from historical results include, but are not limited to, the following:
  • the potential for further trade policy changes under the current administration could disrupt our supply chains and increase costs, e.g., the Utilities’ capital goods and equipment purchases and those of its independent power producers (IPPs) that contain components, sub-components, or raw materials sources from outside the U.S. could experience increases in costs, which could threaten the viability of projects and impact our ability to meet customer demand and the Utilities’ ability to achieve renewable portfolio standards (RPS) goals;
  • the impact of the Maui windstorm and wildfires, including potential liabilities in excess of settlement amounts and potential regulatory penalties, which may result in significant costs that may be unrecoverable (or not reimbursed on a timely basis) through insurance and/or rates;
  • an increase in insurance premiums and the inability to fully recover premiums through rates or the potential inability to obtain wildfire and general liability insurance coverage at reasonable rates, if available at all;
  • the ability to raise the amount of capital necessary on reasonable terms, if at all, for the Company’s and the Utilities’ contribution to the Maui wildfire tort litigation settlement in order to alleviate future conditions that may cause substantial doubt about HEI’s and the Utilities’ ability to continue as a going concern;
  • potential further dilution to existing shareholders if the Company raises funds by issuing additional equity or equity-linked securities;
  • the inability to execute financing plans to alleviate future conditions that may cause substantial doubt about HEI’s and the Utilities’ ability to continue as a going concern prior to the issuance of their respective annual financial statements, which could result in an event of default and an acceleration of the Company’s and the Utilities’ debt and lead to filing for bankruptcy protection if waivers from lenders are not received;
  • extreme weather events, including windstorms and other natural disasters, particularly those driven or exacerbated by evolving climate dynamics, which could increase the risk of the Utilities’ equipment being damaged, becoming inoperable or contributing to a wildfire;
  • future suspension, material reduction or extended delay in dividends or other distributions from operating subsidiaries to HEI;
  • further downgrades by credit rating agencies in their ratings of the securities of HEI and Hawaiian Electric and their impact on results of financing efforts;
  • the risks of suffering losses and incurring liabilities that are uninsured (e.g., damages to the Utilities’ transmission and distribution system and losses from business interruption) or underinsured (e.g., losses not covered as a result of insurance deductibles or other exclusions or exceeding policy limits), and the risks associated with the operation of transmission and distribution assets and power generation facilities, including public and employee safety issues, and assets causing or contributing to wildfires;
  • international, national and local economic and political conditions—including the state of the Hawaii tourism, defense and construction industries; the strength or weakness of the Hawaii and continental U.S. real estate markets; decisions concerning the extent of the presence of the federal government and military in Hawaii; the implications and potential impacts of federal government shutdowns, including the impact to the Utilities’ customers’ ability to pay their electric bills and the impact on the State of Hawaii economy; the implications and potential impacts of U.S. and foreign capital and credit market conditions and federal, state and international responses to those conditions; the potential impacts of global and local developments (including global economic conditions and uncertainties, unrest, terrorist acts, wars, conflicts, political protests, deadly virus epidemic or other crisis); the effects of changes that have or may occur in U.S. policy, such as with respect to immigration and trade; and pandemics;
  • the ability to adequately address risks and capitalize on opportunities related to the Company’s and the Utilities’ sustainability priority areas, which include safety, reliability and resilience, including relating to wildfires and other extreme weather events, decarbonization, economic health and affordability, secure digitalization, human capital management, employee engagement, and climate-related risks and opportunities;
  • citizen activism, including civil unrest, especially in times of severe economic depression and heightened social and political divisions, which could negatively impact customers and employees, impair the ability of the Company and the Utilities to operate and maintain their facilities in an effective and safe manner, and citizen or stakeholder activism that could delay the construction, increase project costs or preclude the completion of third-party or Utility projects that are required to meet electricity demand, resilience and reliability objectives and RPS and other climate-related goals;
  • the effects of actions or inaction of the U.S. government or related agencies, including those related to the U.S. debt ceiling or budget funding, monetary policy, trade policy, energy and environmental policy, and other policy and regulatory changes advanced or proposed by the current administration.

Slide 49

Cautionary Note Regarding Forward Looking Statements continued

  • weather, natural disasters (e.g., hurricanes, earthquakes, tsunamis, lightning strikes, lava flows and the effects of evolving climate dynamics, such as more severe storms, flooding, droughts, heat waves, and rising sea levels) and wildfires, including their impact on the resilience and reliability and cost of the Company’s and Utilities’ operations, and the economy;
  • the timing, speed and extent of changes in interest rates and the shape of the yield curve, which could result in higher borrowing costs and changes in market liquidity;
  • the continued ability of the Company and the Utilities to access the credit and capital markets to fund necessary investments and expenditures (e.g., to obtain short-term and long-term debt financing, including lines of credit, and, in the case of HEI, to issue common stock) under volatile and challenging market conditions, and the potential higher cost of such financings, if available, and due to the uncertainties associated with the costs related to the Maui windstorm and wildfires;
  • the risks inherent in changes in the value of the Company’s pension and other retirement plan assets, and the risks inherent in changes in the value of the Company’s pension liabilities, including changes driven by stock market values, interest rates and mortality improvements;
  • changes in laws, regulations (including tax regulations), market conditions, interest rates and other factors that result in changes in assumptions used to calculate retirement benefits costs and funding requirements;
  • the potential delay by the Public Utilities Commission of the State of Hawaii (PUC) in considering (and potential disapproval of actual or proposed) proposals related to rate rebasing, performance-based regulation (PBR), wildfire safety, renewable energy or grid resiliency, among others, and related costs; reliance by the Utilities on outside parties such as the State, IPPs and developers; supply-chain challenges; and uncertainties surrounding technologies, solar power, wind power, biofuels, liquefied natural gas, environmental assessments required to meet RPS and other climate-related goals; the impacts of implementation of the wildfire mitigation, renewable energy and resilience proposals on future costs of electricity and potential penalties imposed by the PUC for delays in the commercial operations of renewable energy projects;
  • the ability of the Utilities to develop, execute and recover the implementation costs of the Utilities’ action plans included in their Integrated Grid Plan, which was accepted by the PUC in 2024, due to the recent issuance of the PUC’s 2024 Inclinations on the Future of Energy in Hawaii, Governor Josh Green’s Executive Order No. 25-01, Accelerating Hawaii’s Transition Toward 100 Percent Renewable Energy, and the Hawaii State Energy Office’s Alternative Fuel, Repowering and Energy Transition Study on the aforementioned plans of the Utilities;
  • the ability of the Utilities to recover undepreciated cost of fossil fuel generating units, if they are required to be retired before the end of their expected useful life;
  • capacity and supply constraints or difficulties, especially if generating units (utility-owned or IPP-owned) fail or measures such as demand-side management, distributed generation, combined heat and power or other firm capacity supply-side resources fall short of achieving their forecasted benefits or are otherwise insufficient to reduce or meet peak demand;
  • high and/or volatile fuel prices, which increases working capital requirements and customer bills, or delivery of adequate fuel by suppliers (including as a result of the Iran war, Russia-Ukraine war and conflicts in the Middle East), which could affect the reliability of utility operations, and the continued availability to the Utilities of their Energy Cost Recovery Clauses (ECRCs);
  • the continued availability to the Utilities or modifications of other cost recovery mechanisms, including the Purchased Power Adjustment Clauses (PPACs), annual revenue adjustment (ARA) and pension and postretirement benefits other than pensions (OPEB) tracking mechanisms, and the continued decoupling of revenues from sales to mitigate the effects of declining kilowatt-hour sales;
  • the ability of the Utilities to recover increasing or additional costs (e.g., due to trade policies imposed by the current administration, tariffs, inflation, or other factors impacting prices) and earn a reasonable return on capital investments not covered by the ARA, while providing the customer dividend required by PBR;
  • the impact from the PUC’s modification of the PBR for the Utilities pursuant to Act 005, Session Laws 2018, including the potential changes to existing and/or addition of new Performance Incentive Mechanisms (PIMs), third-party proposals adopted by the PUC, and the implications of not achieving performance incentive goals;
  • the impact of fuel price levels and volatility on customer satisfaction and political and regulatory support for the Utilities;
  • unfavorable changes in economic conditions, such as sustained inflation, higher interest rates or recession, that negatively impact the ability of the Company’s customers to pay their utility bills and increase operating costs of the Utilities that cannot be passed on to, or recovered, from customers;
  • the risks associated with increasing reliance on renewable energy, including the availability and cost of non-fossil fuel supplies for renewable energy generation and the operational impacts and related cost impacts of adding intermittent sources of renewable energy to the electric grid;
  • the growing risk that energy production from renewable generating resources may be curtailed and the interconnection of additional resources will be constrained as more generating resources are added to the Utilities’ electric systems and as customers reduce their energy usage;
  • the ability of IPPs to deliver the firm capacity anticipated in their power purchase agreements (PPAs);
  • the potential that, as IPP contracts near the end of their terms, there may be less economic incentive for the IPPs to make investments in their units to ensure the availability of their units;
  • the ability of the Utilities to negotiate, periodically, favorable agreements for significant resources such as fuel supply contracts and collective bargaining agreements and avoid or mitigate labor disputes and work stoppages;

Slide 50

Cautionary Note Regarding Forward Looking Statements continued

  • new technological developments that could affect the operations and prospects of the Utilities or their competitors such as the commercial development of energy storage and microgrids;
  • the potential that cyber or physical security incidents, including potential incidents at HEI, its subsidiaries (including at electric utility plants), third-party service providers, contractors and customers with whom they have shared data (IPPs, distributed energy resources aggregators and customers enrolled under distributed energy resources programs) and incidents at data processing centers used, to the extent not prevented by physical and cybersecurity protections, could result in operational disruption; the misappropriation or loss of confidential or proprietary assets, information or data, including customer, employee, financial, or operating system information, or intellectual property; corruption of data; or potential costs, lost revenues, litigation, or reputational harm;
  • failure to achieve remaining cost savings commitment related to the management audit recommendations of $6.6 million per year during the multi-year rate period (MRP) from June 2021 to May 2026, and continuing until the second MRP begins;
  • federal, state, county and international governmental and regulatory actions, such as existing, new and changes in laws, rules and regulations applicable to HEI and the Utilities (including changes in taxation and tax rates, increases in capital requirements, regulatory policy changes, environmental laws and regulations (including resulting compliance costs and risks of fines and penalties and/or liabilities), the regulation of greenhouse gas emissions, governmental fees and assessments, and potential carbon pricing or “cap and trade” legislation that may fundamentally alter costs to produce electricity and accelerate the move to renewable generation);
  • the impact from the PUC’s implementation of wheeling for the Utilities, including cost shifting and customer equity considerations, the potential increased competition, and other legal and technical implications, pursuant to Act 266, which authorizes wheeling of renewable energy and requires the PUC to establish associated policies and procedures;
  • the impact of competitive pressures from third-party alternative generation resources and regulatory changes affecting the Company’s utility franchise may negatively impact its growth prospects, market position, and stock price;
  • developments in laws, regulations and policies governing protections for historic, archaeological and cultural sites, and plant and animal species and habitats, as well as developments in the implementation and enforcement of such laws, regulations and policies;
  • discovery of conditions that may be attributable to historical chemical releases, including any necessary investigation and remediation, and any associated enforcement, litigation or regulatory oversight;
  • decisions by the PUC in rate cases and other proceedings (including the risks of delays in the timing of decisions, adverse changes in final decisions from interim decisions and the disallowance of project costs as a result of adverse regulatory audit reports or otherwise);
  • decisions by the PUC and by other agencies and courts on land use, environmental and other permitting issues (such as required corrective actions, restrictions and penalties that may arise, such as with respect to environmental conditions or RPS);
  • the risks associated with the geographic concentration of HEI’s businesses;
  • changes in accounting principles applicable to HEI and its subsidiaries, including the adoption of new U.S. accounting standards, the potential discontinuance of regulatory accounting related to PBR or other regulatory changes, the effects of potentially required consolidation of variable interest entities (VIEs), or required finance lease or on-balance-sheet operating lease accounting for PPAs with IPPs;
  • the final outcome of tax positions taken by HEI and its subsidiaries;
  • the ability to effectively utilize federal and state net operating loss carryforwards;
  • the Company’s reliance on third parties and the risk of their non-performance; and
  • other risks or uncertainties described elsewhere in this report (e.g., Item 1A. Risk Factors) and in other reports previously and subsequently filed by HEI and/or Hawaiian Electric with the Securities and Exchange Commission (SEC).

Forward-looking statements speak only as of the date of the report, presentation or filing in which they are made. Except to the extent required by the federal securities laws, HEI, Hawaiian Electric, Pacific Current and their subsidiaries undertake no obligation to publicly update or revise any forward-looking statements, whether written or oral and whether as a result of new information, future events or otherwise.

Slide 51

Explanation of HEI’s Use of Certain Unaudited Non-GAAP Measures

HEI management uses certain non-GAAP measures to evaluate the performance of HEI. Management believes these non-GAAP measures provide useful information and are a better indicator of the companies’ core operating activities. Core earnings and other financial measures as presented here may not be comparable to similarly titled measures used by other companies, and they should be considered in addition to, and not as a substitute for, results prepared in accordance with GAAP. The accompanying tables provide a reconciliation of reported GAAP earnings to non-GAAP Core earnings.

The reconciling adjustments from GAAP earnings to Core earnings are limited to the items related to the Maui wildfires, including the settlement remeasurement and accretion, impacts from HEI’s ownership stake in American Savings Bank, including realized and unrealized gains, and costs related to HEI’s exit from Pacific Current operating businesses. Management does not consider these items to be representative of the company’s fundamental Core earnings.

Slide 52

Reconciliation of GAAP to Non-GAAP Measures—HEI

(in thousands)

HEI Consolidated Three months ended September 30, 2026 Three months ended September 30, 2025 Nine months ended September 30, 2026 Nine months ended September 30, 2025
GAAP¹ net income (as reported) $ 35,450 $ 30,747 $ 189,100 $ 83,503
Excluding special items related to the Maui windstorm and wildfires (after tax)²:
Legal expenses 744 4,302 4,629 15,245
Outside services expense — — — 100
Wildfire securities-related claims — 35,454 — 35,454
Other expense 23 4,375 1,046 13,127
Interest expense — 295 — 2,449
After tax expenses 767 44,426 5,675 66,375
Insurance recoveries³ (154) (36,434) (6,966) (39,630)
Settlement remeasurement⁴ — — (114,248) —
Accretion expense⁵ 13,372 — 26,525 —
Deferral of cost — (4,631) — (16,193)
Total Maui windstorm and wildfires related items, net (after tax) 13,985 3,361 (89,014) 10,552
Gain on sale of investment and net unrealized gain on investment measured at fair value (after tax)⁶ (64,146) — (64,146) —
Loss (gain) on sale of subsidiaries and impairment losses on subsidiary assets sold and assets formerly classified as held for sale (after tax)² 37,671 (1,300) 40,430 13,951
Non-GAAP adjustments (12,490) 2,061 (112,730) 24,503
Non-GAAP (Core) net income $ 22,960 $ 32,808 $ 76,370 $ 108,006
GAAP Diluted earnings per share (as reported) $ 0.20 $ 0.18 $ 1.09 $ 0.48
Non-GAAP (Core) Diluted earnings per share $ 0.13 $ 0.19 $ 0.44 $ 0.62

¹ Accounting principles generally accepted in the United States of America.
² Current year composite statutory tax rate of 25.75%.
³ Includes $6.3 million recognized as an adjustment to the Wildfire tort-related claims for the nine months ended September 30, 2026. Includes insurance recovery related to the settlement of the securities class action of $35.5 million for the three and nine months ended September 30, 2025. Also, for the three and nine months ended September 30, 2025, includes adjustments related to costs that are no longer probable of recovery under the insurance policies.
⁴ Represents an adjustment related to remeasuring the remaining settlement liability at present value in accordance with Accounting Standards Codification Topic 835-30 Imputation of Interest
⁵ Represents accretion expense related to remeasuring the remaining settlement liability.
⁶ Capital gains composite tax rate of 23.9%, net of valuation allowance release.

Slide 53

Reconciliation of GAAP to Non-GAAP Measures—Hawaiian Electric

(in thousands)

Three months ended September 30, 2026 Three months ended September 30, 2025 Nine months ended September 30, 2026 Nine months ended September 30, 2025
Maui windstorm and wildfires related items
Pretax expenses:
Legal expenses $ 1,028 $ 4,316 $ 3,592 $ 12,469
Other expense — 5,791 1,116 17,278
Interest expense — 131 — 2,543
Pretax expenses 1,028 10,238 4,708 32,290
Insurance recoveries¹,² (35) (430) (8,866) 126
Settlement remeasurement³ — — (153,870) —
Accretion expense⁴ 18,010 — 35,724 —
Deferral of cost⁵ — (6,237) — (21,809)
Total Maui windstorm and wildfires related items, net 19,003 3,571 (122,304) 10,607
Income taxes⁶ (4,894) (919) 31,493 (2,731)
After-tax adjustments $ 14,109 $ 2,652 $ (90,811) $ 7,876
Hawaiian Electric consolidated net income
GAAP⁷ net income (as reported) $ 13,488 $ 36,988 $ 186,689 $ 123,954
Excluding special items related to the Maui windstorm and wildfires (after tax)⁶:
Legal expenses 763 3,205 2,667 9,258
Other expense — 4,300 828 12,829
Interest expense — 97 — 1,888
After tax expenses 763 7,602 3,495 23,975
Insurance recoveries¹,² (26) (319) (6,583) 94
Settlement remeasurement³ — — (114,248) —
Accretion expense⁴ 13,372 — 26,525 —
Deferral of cost⁵ — (4,631) — (16,193)
Total Maui windstorm and wildfires related items, net (after tax) 14,109 2,652 (90,811) 7,876
Non-GAAP (Core) net income $ 27,597 $ 39,640 $ 95,878 $ 131,830

¹ Includes $8.5 million recognized as an adjustment to the Wildfire tort-related claims for the nine months ended September 30, 2026.

² Pretax insurance recoveries includes adjustments related to costs that are no longer probable of recovery under the insurance policies. For the three and nine months ended September 30, 2025, adjustments amount to $1.0 million and $7.6 million, respectively, of which, $0.5 million and $4.5 million were deferred to a regulatory asset, respectively, and are reported on line “Deferral of cost”.

³ Represents an adjustment related to remeasuring the remaining settlement liability at present value in accordance with Accounting Standards Codification Topic 835-30 Imputation of Interest.

⁴ Represents accretion expense related to remeasuring the remaining settlement liability.

⁵ Pursuant to the PUC order received on February 12, 2025, deferral accounting treatment limited to insurance premiums and outside services and legal costs associated with the asset-based lending facility credit agreement incurred in 2025 was granted. Applicable amounts were deferred to a regulatory asset.

⁶ Current year composite statutory tax rate of 25.75%.

⁷ Accounting principles generally accepted in the United States of America.

Slide 54

Reconciliation of GAAP to Non-GAAP Measures—Hawaiian Electric (cont’d)

GAAP TO NON-GAAP RECONCILIATION OF UTILITY ROE¹

2027 (rates effective 5/1/2027) Full Year Run Rate of New Rates
GAAP ROE 5.7% – 6.2% 6.7% – 7.2%
Add back:
Wildfire tort liability accretion 1.5% 1.5%
Wildfire Legal/Claims expenses 0.1% 0.1%
Non-GAAP (Core ) ROE 7.3% – 7.8% 8.3% – 8.8%

¹ Columns may not foot due to rounding.

Slide 55

Reconciliation of GAAP to Non-GAAP Measures—Holding Company & Other

(in thousands)

Three months ended September 30, 2026 Three months ended September 30, 2025 Nine months ended September 30, 2026 Nine months ended September 30, 2025
Maui windstorm and wildfires related costs
Pretax expenses:
Legal expenses $ (26) $ 1,478 $ 2,642 $ 8,063
Outside services expense — — — 135
Wildfire securities-related claims — 47,750 — 47,750
Other expense 31 101 293 401
Interest expense — 267 — 756
Pretax expenses 5 49,596 2,935 57,105
Insurance recoveries¹ (172) (48,640) (515) (53,500)
Total Maui windstorm and wildfires related expenses, net of insurance recoveries (167) 956 2,420 3,605
Pretax gain on sale of investment and net unrealized gain on investment measured at fair value (64,146) — (64,146) —
Pretax loss (gain) on sale of subsidiaries and impairment losses on subsidiary assets sold and assets formerly classified as held for sale 50,736 (1,013) 54,452 12,376
Income taxes² (13,022) (534) (14,645) 646
After-tax adjustments $ (26,599) $ (591) $ (21,919) $ 16,627
Holding and Other Companies net income (loss)
GAAP³ net income (loss) (as reported) $ 21,962 $ (6,241) $ 2,411 $ (40,451)
Excluding special items related to the Maui windstorm and wildfires (after tax)²:
Legal expenses (19) 1,097 1,962 5,987
Outside services expense — — — 100
Wildfire securities-related claims — 35,454 — 35,454
Other expense 22 75 217 298
Interest expense — 198 — 561
Maui windstorm and wildfires related expenses (after tax) 3 36,824 2,179 42,400
Insurance recoveries (after tax)¹,² (127) (36,115) (382) (39,724)
Total Maui windstorm and wildfires related expenses, net of insurance recoveries (after tax) (124) 709 1,797 2,676
Gain on sale of investment and net unrealized gain on investment measured at fair value (after tax)⁴ (64,146) — (64,146) —
Loss (gain) on sale of subsidiaries and impairment losses on subsidiary assets sold and assets formerly classified as held for sale (after tax)² 37,671 (1,300) 40,430 13,951
Non-GAAP adjustments (26,599) (591) (21,919) 16,627
Non-GAAP (Core) net loss $ (4,637) $ (6,832) $ (19,508) $ (23,824)

¹ Includes insurance recovery related to the proposed settlement of the securities class action of $47.8 million (pre-tax) for the three and nine months ended September 30, 2025.
² Current year composite statutory tax rate of 25.75%, excluding capital gains, which are taxed at capital gains composite tax rate of 23.9%, net of valuation allowance release.
³ Accounting principles generally accepted in the United States of America.
⁴ Capital gains composite tax rate of 23.9%, net of valuation allowance release.