GE Vernova 10-Qquarter ended 2026-09-30
Positive
Higher gas-turbine pricing and deliveries lift Power profitability, while Prolec GE adds transformer capacity.
Filed 2026-10-28 06:19 ET
Key figures · Q3 FY2026 · period ended 2026-09-30
- Revenue$12.6BYoY +26.8%QoQ +13.9%
- Operating income$1.4BYear ago $366.0MQoQ +113.5%
- Net income$1.3BYoY +185.6%QoQ +93.3%
- Total assets$86.2BYoY +58.5%QoQ +6.7%
- Total debt$2.8B1QoQ −0.8%
How total debt adds up Long-term borrowings (Note 14) $2,795M + Notes to the financial statements $31M Total debt $2,826M Lines as the filer presents them on its balance sheet.
- Shareholders' equity$11.4B2YoY +31.6%QoQ −4.8%
- Tangible book value−$2.6BYear ago $3.6BQoQ −14.8%
Notes (2)
- Total debt: Includes debt reported only in the notes to the financial statements; the balance sheet does not present it as a separate line.
- Shareholders' equity: About the summary: The summary's $(2.57)B is tangible equity after goodwill and intangible assets; the claim's $11.38B is shareholders' equity before those deductions.
Notes on other figures in this summary (1)
Goodwill: Summary: $5.22B · Filing: $9.6B
Comment from AI: The summary's $5.22B is goodwill added in the Prolec acquisition; the claim's $9.61B is the total goodwill balance.
How this filing reads
- Health+0.2Operating cash flow was $16.7B, supported by $19.5B of customer advances for future deliveries.
- Momentum+0.8Q3 revenue rose 27% and operating income increased to $1.39B from $366M.
- Outlook+0.4Orders reached 16.6 GW; $197B obligations provide visibility, with Wind still loss-making.
Executive Summary
GE Vernova sells power-generation equipment, wind turbines, grid equipment and related services to utilities and other electricity customers. It is expanding gas-turbine and electrical-grid capacity to serve rising electricity demand, with the Prolec GE acquisition completed and a larger grid-components deal signed after quarter-end. Q3 revenue grew 27%, while stronger pricing, equipment deliveries and productivity lifted profitability. Remaining performance obligations reached $197B, providing multiyear visibility but requiring substantial manufacturing and project execution. For investors, Power and Electrification are strengthening the business, while Wind’s uneven recovery and acquisition-related gains complicate the earnings picture.
What's Happening in the Business
- Power demand accelerated: Gas-turbine orders reached 16.6 gigawatts vs 7.4 gigawatts a year earlier, exceeding deliveries. Higher prices and increased Aeroderivative and Heavy-Duty Gas Turbine deliveries drove profitability, partly offset by inflation.
- Grid expansion combines acquisitions and internal growth: Electrification’s organic revenue grew 16%, supported by grid systems, switchgear, transformers and power conversion. Prolec GE added transformer manufacturing capacity and $944M of quarterly revenue, although it recorded a $5M pretax loss.
- Another major grid deal: On 10/25/2026, GE Vernova agreed to acquire Trench Group for ≈€8.0B, expanding into high- and medium-voltage components. Management expects equal cash and debt funding and closing in late 2027, subject to approvals.
- Wind’s improvement is incomplete: Lower Offshore Wind project costs, tariff recoveries and higher services volume helped quarterly profitability, but North American equipment demand remained weak. Vineyard Wind installation was completed, substantially all turbines were commissioned, and outstanding customer claims were commercially resolved.
Key Financial Highlights
| Metric | Q3 2026 | 9M 2026 | Investor interpretation |
|---|---|---|---|
| Revenue | $12.6B; +27% Y/Y | $33.1B; +22% Y/Y | Equipment deliveries and Prolec GE drove growth; Q3 organic growth was 18%. |
| Operating income | $1.39B vs $366M | $2.23B vs $787M | Power pricing, Electrification productivity and lower Wind project costs improved margins. |
| Net income | $1.29B vs $453M | $6.70B vs $1.22B | Acquisition and disposal gains dominate the nine-month increase, making it an unreliable recurring earnings baseline. |
| Operating cash flow | — | $16.7B vs $2.51B | Customer down payments and production-slot reservations funded much of the cash inflow. |
| Segment | Q3 revenue | Y/Y change | Q3 segment EBITDA | Y/Y change |
|---|---|---|---|---|
| Power | $6.1B | +25% | $1.3B | +99% |
| Electrification | $3.9B | +51% | $740M | +91% |
| Wind | $2.7B | +3.6% | $72M | From $(61)M |
- Gas Power revenue: $5.12B, +30% Y/Y; this business supplied most of Power’s revenue and drove its margin improvement.
- Earnings quality: Buying the remaining Prolec GE stake required revaluing the existing holding, creating a $3.99B pretax gain without equivalent operating cash generation; the Proficy sale added a $366M pretax gain. These helped nine-month net income substantially exceed operating income.
- Cash timing: Nine-month net income of $6.70B was far below operating cash flow because contract liabilities and current deferred income increased $19.5B. These advance payments finance future deliveries rather than represent completed earnings.
- Reinvestment and returns: Capital expenditures increased to $1.43B from $606M. Repurchases of $5.27B bought ≈6.0M shares, while outstanding shares fell only 1.8% to 265M, showing that issuance offset part of the purchases.
Risk Assessment
- Acquisition exposure: Prolec GE’s preliminary accounting added $5.22B of goodwill, contributing to tangible equity attributable to GE Vernova of $(2.57)B; disappointing acquired-business performance could produce material impairments.
- Advance-funded execution: Large customer deposits support liquidity but accompany multiyear delivery obligations, exposing cash and margins to manufacturing delays and cost overruns.
- Wind recovery: Nine-month Wind EBITDA remained a $(585)M loss vs $(373)M, while remaining performance obligations fell 7% Y/Y, combining execution exposure with weaker North American orders.
- Trench financing and approvals: The ≈€8.0B transaction would add debt and integration demands; regulatory delays could postpone expansion or trigger a termination fee under specified conditions.
This 10-Q lists no risk factors of its own and refers to the annual report. The risks above come from the rest of this filing. Full list: the company's 10-Ks on SEC.
What to Watch
- Gas-turbine conversion: Orders substantially exceed deliveries today. Later filings should show whether higher deliveries and Power profitability follow, or capacity and cost pressures obstruct conversion.
- Trench completion and integration: Management expects closing in late 2027. Approvals and subsequent operating contributions would support the grid expansion; delays, termination or later impairments would challenge it.
- Wind normalization: Management expects remaining Vineyard Wind commissioning in early 2027. Completion alongside sustained segment profitability would validate progress; renewed charges or continued losses would undermine it.
- Cash after advance payments: Customer deposits currently dominate cash generation. Future filings should show whether delivery margins and cash resources support investment and acquisitions as those deposits are consumed.
Longer version: the summary of each of the report's 6 sections, written by an AI model from the same filing.
Changes since the previous 10-Q
The core bet (strengthened): Serve utilities’ rising power and grid needs by converting equipment demand into reliable deliveries. → Higher gas-turbine deliveries and grid growth strengthen that approach; Wind remains uneven.
- Watch item improved Prolec GE integration
Q2 contributed $859M revenue but lost $57M pretax after acquisition accounting and integration costs. → Q3 revenue reached $944M; the pretax loss narrowed to $5M.