SBE SB Energy, Inc. S-1/A amended IPO prospectus section summaries

An AI model summarized each section of the prospectus on its own; the summary was written from these. They are longer and less edited than the summary, and the filing on SEC is the authority.

Cover page

Offering and proposed NVIDIA investment

SB Energy, Inc. filed Amendment No. 3 to its preliminary Form S-1 on November 19, 2026, for an initial public offering of common stock. It has applied to list on the Nasdaq Global Select Market and Nasdaq Texas under “SBE.” No public market for its common stock previously existed. The preliminary filing leaves the IPO size, price range, underwriting discounts and expenses, and expected SoftBank ownership percentages blank, so the offering proceeds, valuation, and resulting ownership and dilution cannot yet be assessed.

NVIDIA has committed to invest $3.0 billion through two transactions:

Transaction Amount and terms
Concurrent private placement $1.5 billion of non-voting Class N common stock at the IPO price
Prepaid forward contract $1.5 billion prepaid to Energy Global; Class N shares are to be delivered upon or immediately before the offering at a price equal to 90% of the IPO price, before underwriting discounts and expenses

Class N stock ranks pari passu with common stock for distributions and is convertible one-for-one into common stock. The IPO is not conditioned on either NVIDIA transaction, which remains subject to customary closing conditions.

Capital structure and control

Before the offering, the company’s direct parent is SBE Global, LP. The offering is expected to qualify as a Specified QPO, automatically converting Energy Global’s outstanding preferred equity interests into common equity. A forward stock split is planned after the registration statement becomes effective and before the offering closes; the split ratio is not specified.

SoftBank Group, through affiliates, is expected to retain voting control. SB Energy expects to qualify as a “controlled company” under Nasdaq and Nasdaq Texas rules and intends to use exemptions from certain governance requirements. The prospectus defines a 33% total-voting-power threshold for SoftBank and its controlled affiliates; falling below it triggers the defined Threshold Date. Actual post-offering ownership and voting percentages remain blank.

The company expects to repay approximately $709.5 million of intercompany notes, plus accrued and unpaid interest, owed to SBE Global before or substantially concurrently with the offering. Potential funding sources include cash on hand, borrowings under a new senior secured revolving credit and letter-of-credit facility expected to be entered into in connection with the offering, or other sources; the facility’s size and terms are not provided. SBE Global also expects to redeem Ares affiliates’ preferred equity in full and cash-net-settle their warrants before or around the offering.

As of the prospectus date, OpenAI held 3,991,809 warrants with a nominal $0.01-per-share exercise price. Of these, 1,737,867 are vested or vest upon IPO pricing and are to be automatically net exercised at offering completion; 2,253,942 remain unvested and outstanding afterward. The filing excerpt does not provide a complete diluted-share reconciliation.

Business scale and reporting status

The planned PORTS-Pike Technology Campus in Pike County, Ohio, is designed to include 17 data center buildings and approximately 8.0 GW-IT of critical IT capacity, plus associated site, infrastructure and leasehold interests. The cover-section information does not provide project costs, construction timing, customer commitments or expected returns.

SE Global Holdings converted from a Delaware corporation to a Texas for-profit corporation on August 28, 2026. SB Energy identifies as a non-accelerated filer and an emerging growth company, allowing it to elect reduced public-company reporting requirements. This section provides no operating results or historical balance-sheet metrics.

About this prospectus

About this prospectus

Corporate and financial reporting basis

SE Global Holdings, LLC is the accounting predecessor of SB Energy, Inc. Historical financial statements generally reflect the LLC and its subsidiaries and exclude transactions related to the offering unless explicitly presented on a pro forma basis. The entity became SE Global Holdings, Inc. following the Corporate Conversion on July 10, 2026; it converted from a Delaware to a Texas corporation on August 28, 2026, and subsequently changed its name to SB Energy, Inc. Share and ownership figures generally do not include shares issuable if the underwriters exercise their option to purchase additional shares.

Operating footprint and development status

As of September 30, 2026, approximately 2.2 GWac of solar and battery energy storage system (BESS) projects were in service under their interconnection and offtake agreements. The Cosmos Research Campus and Milam County Data Center were under construction. PORTS-Pike Technology Campus had a definitive lease, but construction had not begun. Project completion and timing remain uncertain.

Backlog, estimates and execution risk

Backlog represents estimated remaining revenue over the life of executed, binding customer contracts; backlog-associated capital expenditures represent estimated construction and development spending under those contracts. Both are estimates based on assumptions about project completion, regulatory approvals, grid interconnection, contract revenue, schedules, curtailment, equipment degradation and weather. They are not forecasts of realized revenue, profit or costs. Actual revenue could be below backlog estimates and capital expenditures could exceed estimates, potentially materially affecting results and financial condition.

Backlog-associated capital expenditures exclude operating and maintenance costs, certain interest, taxes and overhead, depreciation, cost overruns, delays and customer defaults. Accordingly, this measure does not capture all costs or risks of executing the contracted projects.

Metrics, segments and market information

The prospectus uses non-GAAP measures, including Total Segment Adjusted EBITDA and Net Debt, and business metrics including Data Center Contracted Portfolio and Standalone Power Contracted Portfolio. These measures are supplemental and may not be comparable with similarly named measures used by other companies. Contracted or pipeline capacity spans projects at different stages; it does not necessarily represent operating capacity, establish GAAP revenue recognition, or mean a project will be realized on the anticipated timeline.

Commercial descriptions of data centers, standalone power and solutions do not align directly with the company’s financial reporting segments, which are DC, SP and SLN. Markets for AI infrastructure, data centers, power generation, storage and grid interconnection are rapidly evolving. Third-party reports and internal estimates use differing definitions and methodologies, and some information has not been independently verified; actual market conditions and company performance may differ materially from those estimates.

Brand rights

SB Energy does not own the “SB” or “SB Energy” marks. Its use of those marks is licensed by SoftBank Group Corp. and SBE Global and is subject to consent and termination provisions.

Prospectus summary

Business and strategy

SB Energy is developing an integrated, “power-first” platform for AI data centers, combining power origination and interconnection with data-center development, construction and operations. It expects revenue from long-term data-center leases and services, electricity sales under PPAs and other offtake agreements, and development and operating services. It delivers infrastructure through the rack; customers provide the racks and semiconductors, and SB Energy does not currently offer compute-as-a-service. Standalone Power (SP) owns and operates solar and battery-storage assets; Data Centers (DC) develops campuses and related infrastructure; Solutions (SLN) provides design, engineering, construction-management and operations-management services. SP generates substantially all current revenue; DC was pre-revenue, with initial revenue expected in late 2026.

The company’s strategy is to convert its contracted portfolio into operating campuses, expand existing sites and originate additional large-scale projects, principally in PJM, ERCOT and WECC. It plans to use standardized workflows, prefabrication, automation and in-house execution capabilities, and may pursue acquisitions. Since founding in 2019, it has developed, financed and begun construction on 4.7 GWac of solar and storage projects; it acquired Studio 151 in 2025 to strengthen data-center execution capabilities.

Contracted portfolio, backlog and execution

Portfolio measure September 30, 2026 / prospectus date Prior period
Contracted data-center capacity 8.8 GW-IT 0.1 GW-IT at December 31, 2025
Of which: under construction 0.8 GW-IT —
Of which: contracted, not yet under construction 8.0 GW-IT —
Standalone Power contracted portfolio 5.5 GWac 4.7 GWac at December 31, 2025; 2.9 GWac at December 31, 2024
Data-center and power backlog Approximately $439B —
Data-center backlog Approximately $430B —
Power-segment backlog Approximately $10B —

No data-center capacity was operating. Data-center backlog is concentrated at PORTS-Pike, which represents all contracted-but-not-yet-under-construction data-center capacity and a substantial majority of DC backlog. Weighted-average remaining contract terms were 19.6 years for data-center projects and 16.5 years for power projects. Backlog excludes merchant electricity sales and uncommitted renewals; it does not assure that expected revenue, profits or costs will be realized.

The portfolio includes 803 MW-IT under construction at Cosmos (50 MW), Milam County 1 (308 MW) and Milam County 2 (445 MW). PORTS-Pike in Ohio is contracted for 8,024 MW-IT across Buildings 1–9 (4,248 MW) and Buildings 10–17 (3,776 MW). The 17 OpenAI-affiliate leases signed in August 2026 cover approximately 8.0 GW-IT, have 20-year initial terms and four five-year tenant extension options, and provide for phased, triple-net leases with yield-on-cost rent and annual escalators. Rent and tenant obligations depend on readiness-for-service conditions, including building completion and commissioning, interconnection and generation availability.

PORTS-Pike is designed for 8.0 GW-IT of data-center capacity and 10 GW of gross power load; its first phase targets operations in 2028. Planned neighboring gas generation is not yet built or financed and remains subject to permits and approvals. Utility service agreements for 9.2 GW remain subject to final regulatory approvals. NVIDIA’s residual-value guarantees cover the initial approximately 4.25 GW-IT, with an aggregate guarantee and remedy cap of $105 billion; coverage of the remaining 3.78 GW-IT is discretionary, and otherwise OpenAI must obtain a qualifying replacement guarantor.

Borden and Scurry counties represent approximately 1.7 GW-IT of potential near-term capacity, with ERCOT interconnection corresponding to approximately 2.35 GW gross power capacity available in 2028, subject to large-load verification. These sites are not included in contracted capacity or backlog. The broader early-stage pipeline comprises approximately 30.6 GW-IT of data-center capacity, 4.2 GWac of data-center-dedicated power and 6.9 GWac of standalone power; none is assured to become contracted.

Financial performance

Results 9M 2026 9M 2025 FY 2025 FY 2024
Revenue $177.102M $164.065M $213.467M $232.243M
Cost of operations $63.955M $59.259M — —
General and administrative expense $618.916M $393.564M $679.566M $169.095M
Operating loss $(578.626)M $(359.204)M $(641.572)M $(65.379)M
Consolidated net income (loss) $(1,899.581)M $(481.729)M $(788.092)M $(204.051)M
Net income (loss) attributable to SB Energy $(1,913.701)M $(440.004)M $(738.008)M $106.104M

Revenue increased 7.9% in 9M 2026, but included substantial noncash derivative fair-value changes: $59.0M unrealized and $8.3M realized gains. FY2025 revenue included $63.3M of unrealized and $7.2M of realized derivative fair-value gains; FY2024 included $119.3M and $12.4M, respectively. Customer-contract revenue was $109.8M in 9M 2026, $143.0M in FY2025 and $100.6M in FY2024. Thus, FY2025 total revenue fell even as customer-contract revenue increased.

The 9M 2026 attributable loss included $1,202.814M of warrant-liability fair-value loss and $166.667M of prepaid-forward-contract-liability fair-value loss, as well as $593.6M of noncash stock-based compensation. The company reported a $117.3M 9M 2026 net loss excluding noncash fair-value changes in warrant and prepaid-forward liabilities and stock-based compensation. FY2025 included $674.1M of noncash stock-based compensation; excluding it, net loss was $63.9M. FY2024 included $140.3M of stock-based compensation; excluding it, net income was $246.4M. Total Segment Adjusted EBITDA was $112.084M in 9M 2026 versus $75.470M in 9M 2025, and $119.934M in FY2025 versus $68.630M in FY2024. Accumulated deficit was $2,507.8M at September 30, 2026.

Cash flows 9M 2026 9M 2025 FY 2025 FY 2024
Operating cash flow $(77.389)M $(104.684)M $(40.049)M $(65.871)M
Investing cash flow $(4,139.497)M $(709.023)M $(1,194.998)M $(648.252)M
Financing cash flow $6,150.397M $506.147M $879.582M $1,021.458M

Capital structure, funding and offering

At September 30, 2026, SB Energy had $4.6B of consolidated debt principal, or $4.5B net of unamortized issuance costs and discount, including approximately $1.2B current. Project entities had over $4.1B of project debt and approximately $1.7B of tax-equity financing. Project debt is generally non-recourse to SB Energy, but subsidiary creditors are structurally senior to common shareholders, and project covenants, cash sweeps, debt-service tests and reserves can restrict distributions to the parent.

Balance sheet at September 30, 2026 Amount
Total assets $14.606123B
Debt, net, current and non-current $4.507387B
Total liabilities $10.683392B
Members’ equity $3.389933B
Noncontrolling interests $529.980M

Major maturities include Pelicans Jaw ($874.8M, due by March 2027), Athos Storage ($361.9M, due by February 2027) and Hickory ($473.0M, due October 2027). The company expects to address maturities through refinancing, term-loan conversions and tax-equity funding. At the offering, Hickory borrowings are expected to be repaid using an initial borrowing under a new Credit Facility; the IPO proceeds are not intended for that repayment. The offering-related transactions also include repayment of approximately $709.5M of intercompany notes. Since inception, the company has raised approximately $19B of project capital, including approximately $15B of project debt and nearly $4B of tax equity; these are project-capital amounts, not stated corporate debt.

NVIDIA has committed a total $3.0B investment tied to the offering: a $1.5B private placement and settlement of a $1.5B prepaid forward at 90% of the IPO price. Class N shares are generally non-voting but have the same economic rights as common shares. OpenAI holds warrants including 3,991,809 warrants under the amended 2026 agreement, with vesting linked to project milestones, the offering and valuation thresholds.

Principal risks and governance

The business has no data centers operating and limited experience operating AI-focused facilities at scale. Converting contracts into revenue depends on permits, financing, interconnection, equipment, construction, commissioning and tenant acceptance. OpenAI and SoftBank affiliates are important customers; related-party leases are expected to make up a significant portion of near-term DC revenue. Cosmos, an approximately 50 MW-IT first phase, was expected to begin generating revenue in Q4 2026 subject to completion and acceptance. Its SoftBank-affiliate lease has a 15-year initial term and approximately $2.5B expected aggregate rent; a SoftBank Group Capital guaranty has anticipated aggregate exposure of approximately $2.9B. The project was financed in part by $999.0M principal amount of 8.875% senior secured notes due 2031.

The filing highlights power constraints, interconnection delays, long-lead equipment, cost inflation, construction and permitting risks, financing needs, power-price and community concerns, counterparty credit risk, and dependence on incentives and tax equity. PORTS-Pike’s planned generation and infrastructure are particularly material dependencies. SoftBank is expected to retain control and governance rights; the company intends to use controlled-company exemptions from certain listing governance requirements. A material weakness in internal control over financial reporting was identified. SBE also reported a history of losses and no assurance of profitability.

Risk factors

Principal risks

Demand, backlog and project concentration

SBE’s strategy and substantial planned investment depend on sustained growth in AI-ready data-center demand, hyperscaler and enterprise spending, and long-term power availability. The filing cites estimates that the five largest hyperscalers will spend approximately $768 billion in 2026 on AI-enabled digital infrastructure, and expects agentic AI to require 10–100 times the compute of a single chatbot query. These are assumptions supporting SBE’s pipeline and projected economics—not contracted revenue. More efficient models or chips, slower AI adoption or monetization, hyperscaler self-builds, oversupply, changing workload requirements, regulation or public opposition could reduce demand, occupancy or lease rates, or make purpose-built facilities costly to retrofit.

Conversion of the pipeline is uncertain: a substantial majority has neither binding tenant or offtake arrangements nor construction underway. As of the prospectus date, no leased data-center projects were operating and SBE had not generated data-center revenue. Signed data-center lease capacity was approximately 8.8 GW-IT, all attributable to SoftBank-affiliated tenants at Cosmos and OpenAI-affiliated tenants at Milam County Buildings 1 and 2 and PORTS-Pike; approximately 0.8 GW-IT was under construction and 8.0 GW-IT at PORTS-Pike was contracted but not under construction. PORTS-Pike represents all contracted-but-not-under-construction data-center capacity and a substantial majority of data-center backlog. Delays, cost increases, financing gaps, missing permits or power, or tenant termination could therefore materially impair expected revenue and returns.

Contracted-backlog capex is estimated at $176 billion over approximately six years—about 31% in years 0–2, 41% in years 2–4 and 28% in years 4–6—before additional spending for uncontracted pipeline. For each PORTS-Pike building, SBE targets debt financing of up to 90% of estimated $8–$9 billion capex. Actual funding, pricing and availability depend on markets, project progress and tenant credit; tighter credit, especially for sub-investment-grade offtakers, could require more equity, delay or reduce projects, or make them uneconomic. Backlog is not assured revenue or profit: it depends on permitting, interconnection, financing, procurement, construction and commissioning, and may be delayed, reduced or terminated. It excludes much of the risk of cost overruns and does not ensure expected margins.

Power, construction and operating execution

PORTS-Pike is designed for 8.0 GW-IT of data-center capacity and approximately 10 GW of gross power load. Utility service is contracted for only about 0.8 GW of gross load; additional transmission, studies and approvals are needed. The campus also depends on approximately 9.2 GW of planned neighboring gas-fired generation, which remains subject to funding, permits and construction. SBE does not expect to own or operate those facilities; the expected U.S.–Japan Partnership’s funding, power arrangements and timing remain uncertain. SBE says the campus could use PJM grid power if generation is delayed, but alternative power may be unavailable, costly or inadequate. Power and interconnection are conditions to readiness for service and rent commencement.

Interconnection queues, grid upgrades, transmission outages, congestion and curtailment could delay or constrain projects. ERCOT batch studies make large-load applications dependent on aggregate requests, reliability studies and upgrade costs; approvals could be delayed, reduced or denied. Regulatory proceedings and new large-load rules in PJM, MISO, CAISO and ERCOT may change costs and timelines. Texas has introduced additional review of large loads and temporarily paused certain energization approvals; evolving rules in Ohio and other jurisdictions, local moratoria, litigation and community opposition could also impede development. PORTS-Pike transmission expansion alone could require over $6 billion of credit support, such as letters of credit or guarantees; this is collateral, not necessarily a termination payment, and may not be reflected on the balance sheet.

Projects require scarce contractors, skilled labor and long-lead equipment, including transformers, switchgear, turbines, cooling systems and batteries. Turbine lead times may reach seven years; tariffs, export controls, geopolitical disruption, semiconductor shortages and supplier failures could increase costs or delay completion. The largest supplier advance was approximately $213.0 million at September 30, 2026, versus approximately $17 million for FY2025, increasing exposure if a supplier fails. Novel, high-density AI facilities may have unanticipated power, cooling or networking problems. Leases require high service availability—sometimes more than 99.99%—and failures can produce rent credits, liquidated damages, tenant buy-outs or termination; certain interruptions continuing 30 consecutive days may permit termination. Parent-recourse completion and performance guarantees can expose SBE to cash demands and project-debt remedies.

SBE has limited experience with gas generation, fuel procurement and thermal-plant operations; gas projects add commodity, emissions, permitting and reliability risks. Power projects also face weather, equipment degradation, outages, water scarcity and wholesale-price volatility. PPAs may allow curtailment of up to 100% of committed capacity in specified circumstances, while under-delivery can trigger damages or termination. SBE’s solar and storage operations are geographically concentrated in states exposed to wildfire, hail, extreme weather, drought, grid constraints and changing regulation. Damage during the five-year tax-credit recapture period could create repair, interruption and indemnity costs at once; insurance may be costly, unavailable or inadequate. Solar-facility asset-retirement obligations were $66.7 million at September 30, 2026, versus $63.7 million at December 31, 2025.

Customer, counterparty and financial exposure

OpenAI is the tenant for PORTS-Pike and Milam County Buildings 1 and 2, a significant investor and a strategic partner; SoftBank is the Cosmos tenant. No unaffiliated data-center tenants were signed. Deterioration, renegotiation or termination by either group could affect multiple projects and financing. For the nine months ended September 30, 2026, three customers each contributed more than 10% of revenue excluding swap settlements—approximately 28%, 17% and 11%; in FY2025, four customers exceeded 10%, with the largest at approximately 29%.

NVIDIA’s guaranty covers only the initial 4.25 GW-IT at PORTS-Pike under specified tenant insolvency or uncured monetary-default conditions, not as a general rent guaranty. It has a $105 billion aggregate cap that declines over the 20-year lease; the remaining 3.78 GW-IT is eligible for an additional guaranty only at NVIDIA’s discretion. The guaranty depends on NVIDIA’s ability to perform and may not fully compensate for lost revenue. NVIDIA is also important to GPU supply. Separately, the 15-year Cosmos lease with a SoftBank affiliate has expected aggregate rent of approximately $2.5 billion and a SoftBank Group Capital Limited guaranty with anticipated aggregate exposure of approximately $2.9 billion; SBE expects first-phase revenue in Q4 2026, subject to milestones and conditions.

As of September 30, 2026, consolidated debt was approximately $4.6 billion in aggregate principal ($4.5 billion net of unamortized issuance costs and discount), including approximately $1.2 billion current; subsidiary project debt exceeded $4.1 billion, and outstanding letters of credit totaled $1.2 billion. Subsidiary creditors are structurally senior to common shareholders, and project covenants can trap cash or restrict distributions. A new Credit Facility intended to refinance $473.0 million outstanding under Hickory was not assured; Hickory bore interest at six-month Term SOFR plus 375 basis points and matured October 18, 2027. Defaults, lease failures or refinancing difficulties could trigger acceleration, foreclosure, cross-defaults or demands under guarantees. Separately, $709.5 million of intercompany borrowings from SBE Global were direct obligations of SB Energy, Inc. expected to be repaid around the offering.

SBE has incurred significant losses. For the nine months ended September 30, 2026, net loss attributable to SB Energy, Inc. was approximately $1,913.7 million, including $593.6 million of non-cash stock-based compensation and $1,202.8 million of non-cash warrant-liability fair-value expense; excluding those items, the stated loss was $117.3 million. For FY2025, attributable net loss was $738.0 million, including $674.1 million of non-cash stock-based compensation; excluding it, the loss was $63.9 million. Liability-classified OpenAI warrants are remeasured at fair value, adding earnings volatility; 2,253,942 unvested warrants remain after the offering.

Regulation, tax credits and governance

SBE had raised nearly $4 billion in tax equity financing through September 30, 2026 and expects continued reliance on tax equity and credit transfers. The One Big Beautiful Bill Act accelerates termination of solar and wind Sections 45Y/48E credits: projects generally must begin construction by July 4, 2026, or be placed in service by December 31, 2027, to qualify. SBE says most of its current solar and battery pipeline meets applicable safe harbors, but later-stage projects may face reduced incentives and less favorable financing. Foreign-entity restrictions, tax-credit recapture, changes to state incentives and limited tax-credit insurance could further weaken project economics.

SoftBank is expected to control a majority of voting power after the offering, with board-designation, preemptive and other governance rights. Controlled-company exemptions reduce independent-board and committee protections. Related-party leases, services, royalties and financing relationships with SoftBank and OpenAI may create conflicts, limit SBE’s ability to enforce or renegotiate terms, and complicate investors’ assessment of results. Transfer restrictions and national-security requirements may also limit financing, asset sales or restructuring options. FERC authorization is generally required for investors and affiliates acquiring 10% or more of voting stock; violations can carry penalties of approximately $1.58 million per violation per day.

Reporting controls

A material weakness in internal control over financial reporting involving technical-accounting review of complex transactions and related presentation and disclosure affected FY2024, FY2025, Q1 and Q2 2026, and was still unremediated as of September 30, 2026. Remediation work is underway but requires sustained effective operation and testing. Further errors could cause restatements, investigations, litigation, delisting or loss of investor confidence. The public-company transition will also add reporting, governance and compliance costs. SBE does not expect to pay cash dividends in the foreseeable future; the expected Credit Facility would prohibit them before January 1, 2029, subject to other restrictions thereafter.

Cautionary note regarding forward looking statem

Forward-Looking Statements and Principal Risks

SBE’s forward-looking statements concern its ability to develop and deliver data-center and power-generation projects on schedule, at expected costs, and at planned scale. Outcomes depend on securing customers and leases, obtaining permits and regulatory approvals, and gaining sufficient grid-interconnection capacity. The company cautions that it may not realize projected revenue associated with its backlog or complete backlog-related projects within estimated capital expenditures.

SBE also identifies uncertainty around financing, liquidity, capital requirements, and its ability to obtain financing on acceptable terms. Other risks include competition in data-center and AI infrastructure; the availability of renewable-energy incentives; climate and extreme-weather impacts; cybersecurity and information-technology disruptions; and changing energy, data-center, and AI regulation. Public concerns about energy use, water consumption, and environmental effects could also affect the business.

Additional risks include reliance on controlling shareholder SoftBank and potential conflicts of interest, geopolitical developments, retaining key personnel, and meeting public-company compliance obligations. SBE reports an identified material weakness in internal control over financial reporting and cautions that remediation may not succeed or that it may not maintain effective controls. It also warns that stock-price volatility and future share sales could put pressure on its share price.

Forward-looking statements reflect SBE’s expectations as of the prospectus date; actual results may differ materially. They do not account for the potential effects of future transactions, and SBE generally undertakes no obligation to update them except as required by law.

Use of proceeds

Use of proceeds

SBE expects to use substantially all net proceeds from the IPO for general corporate purposes, primarily working capital, operating expenses, and capital expenditures to develop and construct data center, power generation, storage, and related infrastructure projects. Proceeds from the Concurrent Private Placement, if it closes, would also be used for general corporate purposes.

The company may also use proceeds for technology development or complementary acquisitions and investments, but it has no binding commitments for material transactions. SBE has not designated specific uses or amounts and will retain broad discretion over the proceeds. If proceeds are materially below the expected maximum, it expects to prioritize working capital, operating expenses, and capital expenditures for existing committed projects ahead of technology development or potential acquisitions and investments.

SBE does not intend to use IPO proceeds to repay approximately $473.0 million outstanding under the Hickory Facilities.

Dividend policy

Dividend Policy

SBE has never declared or paid cash dividends and expects to retain available funds and future earnings to operate and expand the business. It does not expect to pay dividends in the foreseeable future.

As a holding company, SBE’s ability to distribute cash depends largely on dividends and other distributions from its subsidiaries. Those distributions are subject to the subsidiaries’ earnings, tax considerations, and financing-agreement covenants. Existing subsidiary debt instruments restrict distributions or loans to SBE.

The Credit Facility expected in connection with the offering will directly restrict dividends. SBE does not expect to be permitted to pay cash dividends before January 1, 2029. After that date, any payment would remain conditional on satisfying a minimum-liquidity covenant and specified baskets and leverage-based tests. Future debt arrangements may impose additional restrictions.

Any eventual dividend decision will be at the board’s discretion and subject to applicable law, SBE’s financial condition and results, capital needs, contractual restrictions, and other relevant factors.

Capitalization

Capitalization as of September 30, 2026

Capitalization item Amount
Cash and cash equivalents $996.652M
Debt, net $4.507387B
Related-party debt $709.520M
Total debt $5.216907B
Prepaid forward contract liability $1.666667B
Warrant liability $2.347068B
Other non-current liabilities $129.445M
Redeemable noncontrolling interests $2.818M
Contributed capital $5.897763B
Accumulated deficit $(2.507830)B
Noncontrolling interests $529.980M
Total shareholders’ equity $3.919913B
Total capitalization $13.282818B

Planned refinancing and offering-related transactions

The company expects to borrow $473.0M under a new Credit Facility and use the proceeds to repay the Hickory Facilities. The repayment is described as $473.0M of principal, includes $0.7M of accrued interest, and involves $11.4M of debt discount. The company expects to write off $11.4M of deferred financing costs. Following repayment, Hickory commitments are expected to terminate and related guarantees and liens to be released. The refinancing therefore replaces the Hickory borrowings rather than eliminating all borrowing.

The company also expects to repay $709.5M of intercompany notes owed to SBE Global using cash on hand. SBE Global expects to use those proceeds, together with other parent-level cash, in connection with the Ares Redemption. The filing says the Ares Redemption does not create a separate debt or equity adjustment in the capitalization table. The described transactions result in a pro forma cash decrease of approximately $710.2M.

The pro forma as adjusted capitalization would include IPO proceeds and approximately $1.5B from NVIDIA’s concurrent private placement. NVIDIA also receives Class N shares when a prepaid forward contract settles, based on its $1.5B prepaid purchase amount and a settlement price equal to 90% of the IPO price; settlement removes the prepaid forward liability.

The Corporate Conversion reclassifies approximately $5.9B of historical members’ equity into common stock at par and additional paid-in capital. This is a non-cash reclassification and does not itself change total equity or total capitalization.

Dilution and sensitivity

Warrant vesting and settlement, the conversion of certain warrant tranches from liability to equity classification, and accelerated vesting of incentive awards affect equity and accumulated deficit. However, the excerpt leaves the relevant dollar adjustments and assumed IPO price blank. IPO share counts and several other capitalization-table amounts are also missing, so the pro forma as adjusted outcome cannot be quantified from the excerpt; it depends on final pricing, offering size, expenses, and transaction terms.

Each $1.00 change in IPO price and each 1.0M-share change in offering size would affect cash, additional paid-in capital, shareholders’ equity, and total capitalization; the per-unit effects are not specified. Potential additional dilution excluded from the stated pro forma share counts includes 2,253,942 OpenAI Warrants that remain unvested after the offering and may be exercisable for an unspecified number of common shares, as well as shares reserved for future issuance under the 2026 Plan. The excerpt does not provide the capitalization table’s common-share counts.

Dilution

Dilution

The dilution calculations are illustrative and are based on the IPO and related transactions as described in the filing. The provided text leaves blank the IPO price and share counts, historical and pro forma net tangible book value and per-share amounts, investor dilution, shareholder share/consideration breakdown, and the full effects of the underwriters’ option; accordingly, these inputs and outputs cannot be quantified from the text.

The pro forma calculations are stated as of September 30, 2026 and assume the Corporate Conversion and Stock Split; repayment of the Intercompany Notes and Hickory Facilities; entry into the Credit Facility; vesting of the OpenAI Warrant; and the Prepaid Forward Contract. The share-purchase comparison also includes the Concurrent Private Placement and IPO. Actual dilution may differ because the figures are illustrative and depend on the actual IPO price and other offering terms.

Changes in the assumed IPO price or the number of shares sold would affect pro forma adjusted net tangible book value, dilution, and total consideration. The calculations exclude shares reserved for future grants or sale under the 2026 Plan and shares issuable upon exercise of unvested OpenAI Warrants; future issuance of these shares could increase dilution. The company also may seek additional capital even if it believes current or future operating plans are funded, and any equity or convertible-security issuance could further dilute shareholders.

Management's discussion and analysis

Business, portfolio and backlog

SB Energy develops data centers (DC), standalone power (SP) and related design, engineering, construction-management and operations services (SLN). Its strategy is to co-locate data centers with power generation to address power availability and accelerate energization. SLN revenue is primarily intercompany and eliminated on consolidation.

Contracted portfolio Sept. 30, 2026 Dec. 31, 2025 Dec. 31, 2024
Data centers (GW-IT) 8.8 0.1 0
Standalone power (GWac) 5.5 4.7 2.9

No data-center capacity was operating as of the disclosure. Of the 8.8 GW-IT contracted, 0.8 GW-IT was under construction and 8.0 GW-IT was contracted but not yet under construction; initial leasing revenue was expected in Q4 2026. The SP portfolio comprised 2.2 GWac operating, 2.5 GWac under construction and 0.8 GWac contracted for future construction. Separately, approximately 14.2 GWac of data-center-dedicated power projects had filed interconnection applications; about 10 GWac was expected to be owned by third parties and none was contracted. DC construction in progress rose from $1.9B at year-end 2025 to $5.1B at September 30, 2026.

Management estimated approximately $439B of contracted backlog—about $430B DC and $10B SP—though this hypothetical estimate depends on construction, commissioning, approvals and other conditions and is not necessarily indicative of realized revenue. Expected recognition was $2B within 24 months, $14B in months 25–48, $32B in months 49–72, $39B in months 73–96 and $352B thereafter. Remaining cash capital expenditures to complete contracted projects were estimated at approximately $176B ($173B DC and $3B SP). Backlog excludes uncommitted pipeline, merchant sales, uncommitted renewals and gross pass-through costs not retained economically. Weighted-average remaining contract length was 19.6 years for DC and 16.5 years for power.

The DC portfolio is concentrated in three related-party campuses: Cosmos (SoftBank affiliate), Milam County and PORTS-Pike (OpenAI affiliates); there were no unaffiliated data-center tenants. PORTS-Pike leases cover approximately 8.0 GW-IT, with 20-year initial terms; Cosmos leases have 15-year initial terms and approximately $2.5B expected rent. Lease commencement depends on service readiness and tenant acceptance. NVIDIA provided residual-value guarantees for the initial nine PORTS-Pike buildings (about 4.25 GW-IT), subject to an aggregate $105B remedy cap and specified conditions. The three largest customers contributed approximately 28%, 17% and 11% of 9M 2026 revenue excluding swap settlements, or about 57% combined.

Results and cash flows

Consolidated results 9M 2026 9M 2025 FY 2025 FY 2024
Revenue $177.102M $164.065M $213.467M $232.243M
Cost of operations, excluding D&A $63.955M $59.259M $81.393M $55.213M
Depreciation, amortization and accretion $72.857M $70.446M $94.080M $73.314M
General and administrative expense $618.916M $393.564M $679.566M $169.095M
Operating loss $(578.626)M $(359.204)M $(641.572)M $(65.379)M
Net loss $(1.900)B $(481.729)M $(788.092)M $(204.051)M
Net loss attributable to SB Energy, Inc. $(1.914)B $(440.004)M $(738.008)M $106.104M income
Cash flows and construction investment 9M 2026 9M 2025 FY 2025 FY 2024
Operating cash flow $(77.389)M $(104.684)M $(40.0)M $(65.9)M
Investing cash flow $(4.140)B $(709.023)M $(1.195)B $(648.3)M
Financing cash flow $6.150B $506.147M $879.6M $1.021B
PPE cash payments $3.604B $689M $1.093B* $601.2M

*FY 2025 PPE payments comprise the reported $1.074B of construction-in-progress payments and $19.1M of other PPE payments.

Nine-month revenue growth was driven by power-swap marks rather than stronger customer sales: revenue from customer contracts fell 2.5% to $109.843M from $112.717M, while realized and unrealized swap revenue totaled $67.3M versus $51.3M. Energy revenue declined to $95.8M from $99.0M and REC revenue to $12.0M from $13.8M; generation fell 1.6% to 3,998 GWh from 4,062 GWh amid curtailment and basis impacts, partly offset by the Angela project. For FY 2025, energy revenue rose 43.8% to $125.8M from $87.5M as generation increased 15.5% to 5,097 GWh from 4,412 GWh, but lower swap marks drove the overall revenue decline.

Nine-month net loss included a $1.203B noncash warrant-liability remeasurement loss and a $166.7M prepaid-forward fair-value loss. G&A was dominated by stock-based compensation of $593.6M, versus $371.2M in 9M 2025; FY 2025 included a $533.7M increase in stock-based compensation. Tax-equity allocations under the HLBV method and fair-value changes in derivatives and warrants can make reported earnings highly volatile relative to operating performance. The NVIDIA prepaid forward provided $1.5B in August 2026; it had a $1.667B carrying value at September 30 and is expected to settle at an IPO in a variable number of nonvoting shares.

Investing cash outflow accelerated with development: 9M 2026 included $3.472B of construction-in-progress payments and $535.9M of supplier advances. Financing cash inflows included $2.997B debt proceeds, $2.302B capital contributions and the $1.5B NVIDIA forward, partly offset by $541.2M debt repayments. FY 2025 cash use in operations remained lower than FY 2024 despite a larger net loss, principally because of noncash adjustments, including $674.1M of stock compensation.

Liquidity, financing and execution risks

At September 30, 2026, debt for borrowed money was $4.6235B and cash and restricted cash were $2.1522B; non-GAAP Net Debt was $2.4712B. Cash comprised $996.7M unrestricted and $1.1556B restricted. The company also reported $1.9B of undrawn committed borrowing capacity and expected available liquidity, project distributions and tax-equity contributions to cover needs for at least 12 months. Restricted cash is subject to project and contractual limitations. Related-party notes totaled $709.5M at 6.000% and 7.272%; the company intended to repay them using cash and/or Credit Facility borrowings in connection with redemption of SBE Global’s Ares preferred interests. The $800M Ares issuance and its preferred interests are obligations of the parent, not SB Energy, Inc.

Project debt increased with construction. Major balances included $999.0M principal of Cosmos notes bearing 8.875% and due 2031, $1.0963B Libra construction debt, $286.6M Athos Storage construction debt and $75.3M Athos bridge debt. Pelicans Jaw had $485.4M construction and $389.3M bridge principal outstanding, both due March 31, 2027. Global Borrower had $263.0M term and $210.0M revolving principal, at six-month SOFR plus 3.75%, due October 18, 2027. The proposed $3.0B senior-secured Credit Facility was expected to repay the Hickory Facilities, but closing was not assured. Outstanding letters of credit and similar support totaled $1.1988B, consuming capacity and potentially requiring cash collateral. The company reported covenant compliance; distribution tests include 1.20:1.00 debt-service coverage for Big Five and 1.10:1.00 for Global Borrower.

Capital needs and backlog conversion depend on financing, tax-equity availability, permits, grid interconnection, equipment procurement, construction and timely service readiness. Federal clean-energy legislation and FEOC requirements have contributed to tax-equity market contraction and lower tax-credit transfer pricing. Supplier commitments for project completion totaled $6.79B from the remainder of 2026 through 2028. Cost inflation, labor and equipment shortages, construction delays, changing AI infrastructure demand, customer self-builds and counterparty default could reduce returns or delay revenue. A 100-basis-point rate move would change annual cash interest by approximately $35.9M before hedging; interest-rate swaps had $2.1403B notional and a $139.3M asset at September 30, 2026.

Reporting and control matters

A material weakness in technical accounting review controls affected 2025 and 2024 annual statements and the March and June 2026 quarters; it remained unremediated at September 30, 2026. Remediation includes additional review controls, procedures and training, but effectiveness must still be demonstrated. The company also uses the JOBS Act extended transition period for new accounting standards.

Business

Business model and market opportunity

SB Energy develops data centers and power assets, combining power origination, interconnection, site control, generation, data-center construction and operations. Its turnkey data-center scope includes land, power, fiber, water, buildings and internal systems, but not customers’ compute hardware. It expects revenue from long-term data-center leases and services, power sales under PPAs and other offtake agreements, and development and operating services. Data-center leases are generally 15–20-year triple-net contracts; power PPAs commonly run 15–25 years. The model is intended to address power availability and delivery speed—constraints the company considers more binding than land or fiber—as AI drives demand. Cited global data-center capacity is projected to rise from 82 GW in 2025 to 274 GW by 2030.

Contracted data centers and pipeline

Data-center project Capacity Status and expected timing
Cosmos, Texas 50 MW-IT Under construction; initial revenue expected in Q4 2026, with full RFS targeted by May 2027
Milam County 1, Texas 308 MW-IT Under construction; first operations expected in 2027
Milam County 2, Texas 445 MW-IT Under construction; first operations expected in 2028
PORTS-Pike, Ohio 8.024 GW-IT Contracted, construction not started; phased operations targeted for 2028–2032

Contracted capacity totals 8.827 GW-IT, of which 803 MW-IT is under construction; no data-center capacity is operating. The company reports approximately $439B of backlog—about $430B for data centers and $10B for power—with weighted-average remaining contract terms of 19.6 years and 16.5 years, respectively. Backlog covers data-center leases and 5.5 GWac of power that is operating, under construction or contracted; it excludes merchant power sales and uncommitted renewals. PORTS-Pike is all contracted-but-not-yet-under-construction capacity and a substantial majority of data-center backlog, making delivery highly concentrated.

Beyond contracted projects, the company cites approximately 30.6 GW-IT of data-center pipeline, 4.2 GWac of dedicated data-center power and 6.9 GWac of standalone power, none included in contracted capacity. Borden and Scurry Counties together represent about 1.7 GW-IT, with interconnection associated with approximately 2.35 GW of gross power capacity targeted for availability in 2028, subject to verification; neither site is leased or in backlog.

Project economics and execution dependencies

Cosmos is leased to a SoftBank affiliate under a 15-year triple-net lease, with expected aggregate rent of approximately $2.5B and a SoftBank Group Capital tenant-obligation guaranty with anticipated exposure of approximately $2.9B. Milam and PORTS-Pike are leased to OpenAI affiliates. PORTS-Pike comprises 17 buildings under 20-year leases, with four optional five-year extensions and phased rent commencement. Its planned campus requires approximately 10 GW of gross power load. The company has committed to at least $50.0M of OpenAI software and tools purchases through 2028; it says related-party arrangements were negotiated on arm’s-length terms.

PORTS-Pike’s power plan depends on PJM grid supply and approximately 9.2 GW of planned gas-fired generation. The plants are not owned by SB Energy, are not financed or constructed, and still require permits and definitive arrangements; SB Energy says it is not party to an agreement governing Partnership funding or plant construction, ownership or operation. AEP Ohio and affiliates intend approximately $5.1B of grid-upgrade capital costs, which SB Energy expects to pay, together with regulated returns and other charges, through utility charges; it also expects to post collateral and assume additional transmission charges. Utility service and retail power-supply arrangements remain subject to execution and approvals.

NVIDIA provided residual-value guarantees for the initial 4.25 GW-IT at PORTS-Pike, with a $105B aggregate remedy cap; it may elect to cover the remaining 3.78 GW-IT. The guarantees are conditional, including on tenant insolvency or uncured monetary default, and the guaranteed minimum declines over time. OpenAI leases also provide for delay remedies, including rent credits, self-help rights and, in specified circumstances, termination. Delays can defer rent while construction and interest costs continue, trigger damages, buyout or repayment obligations, and pressure liquidity or debt covenants.

Power portfolio and financing

At September 30, 2026, approximately 2.2 GW of solar and battery-storage capacity was operating and 2.5 GW was under construction; a further 0.8 GW was contracted but not under construction. At December 31, 2025, standalone solar capacity was approximately 2,142 MWac. The portfolio generated approximately 5,097 GWh in FY2025 and 3,998 GWh in 9M2026; increased generation primarily reflected new projects reaching commercial operation. In 2025, portfolio capacity factor was 27.2% and availability factor 96.7%. Solar output remains exposed to weather, seasonality, grid congestion and curtailment.

Since inception, SB Energy reports raising approximately $19B of project capital—about $15B of project debt and nearly $4B of tax equity. Most project financing is non-recourse to the parent but secured by subsidiary assets and cash flows; covenants, cash sweeps and reserves can limit upstream distributions. At September 30, 2026, aggregate principal debt was approximately $4.6B ($4.5B net of issuance costs and discount), including $1.2B current; project entities also had over $4.1B of project debt and approximately $1.7B of tax-equity financing arrangements. SB Energy expects further debt for PORTS-Pike and other projects. Near-term maturities included Pelicans Jaw ($874.8M by March 2027), Athos Storage ($361.9M by February 2027) and Hickory ($473.0M in October 2027); the company expects to use conversions, refinancing and tax equity. In May 2026, a subsidiary issued $999.0M aggregate principal of 8.875% senior secured notes due 2031 to finance Cosmos.

Financial performance

Revenue and earnings 9M2026 FY2025 FY2024
Revenue $177.1M $213.5M $232.2M
Customer-contract revenue $109.8M $143.0M $100.6M
Realized power-swap fair-value changes $8.3M $7.2M $12.4M
Unrealized power-swap fair-value changes $59.0M $63.3M $119.3M
Net income (loss) attributable to SB Energy $(1,913.7)M $(738.0)M $106.1M

The 9M2026 loss included $1,202.8M of non-cash warrant-liability fair-value expense and $593.6M of non-cash stock-based compensation; excluding the cited warrant/prepaid-forward liability fair-value expenses and stock compensation, the company reported a $117.3M net loss. FY2025 included $674.1M of stock compensation, while FY2024 included $140.3M; excluding those amounts, the company reported a $63.9M loss in FY2025 and $246.4M of income in FY2024. Revenue to date has been predominantly from power; data-center revenue has not been significant. Construction in progress was approximately $5.1B at September 30, 2026, and accumulated deficit was $2,507.8M.

Risks, capabilities and regulation

The 2025 acquisition of Studio 151 added data-center construction-management and operations expertise; the company also cites experience delivering solar and storage projects and a team of approximately 350 professionals. Its strategy depends on converting a large, concentrated pipeline into operating assets amid competition for customers, equipment, interconnection, financing and permits. PORTS-Pike permitting, transmission upgrades, gas-generation development, community impacts and water availability are key uncertainties. Federal clean-energy tax-credit rules changed under the OBBBA: solar and wind projects generally must begin construction by July 4, 2026, or enter service by December 31, 2027, to qualify for specified credits, and new foreign-entity restrictions may apply. Cybersecurity, evolving AI and energy regulation, environmental requirements and national-security oversight add compliance and execution risks.

Management

Leadership and board

After the offering, SBE expects a nine-member board: Co-CEOs Rich Hossfeld and Abhijeet Sathe, plus seven non-employee directors. Alex Clavel is expected to chair the board. The nominees bring experience in energy project finance, investment management, public-company governance and risk, finance and accounting, and technology infrastructure, AI, and data centers. SoftBank-designated nominees will serve alongside OpenAI-designated Uday Ruddarraju.

The Co-CEOs have helped build the business since 2019 and bring energy-infrastructure, renewable-energy, engineering, and operations experience. CFO Gaetan Frotte joined in February 2023; before SBE, he spent more than 16 years at NRG Energy, most recently as SVP and Treasurer, with experience in financing, cash management, insurance, an interim CFO role, and an IPO. General Counsel Ryan Bates has more than 15 years of renewables and energy-sector legal experience. Other disclosed director experience includes Alexi Wellman’s public-company CFO, CEO, and audit-committee roles; Kimberly Johnson’s financial-services operating and risk-management experience; and Ruddarraju’s compute and infrastructure work at OpenAI and xAI. The company reports no family relationships among directors and executive officers.

Ownership and governance

SoftBank is expected to hold more than 50% of voting power immediately after the offering, making SBE a controlled company under Nasdaq and Nasdaq Texas rules. Under the Shareholders’ Agreement, SoftBank may designate up to six director candidates while it and its controlled affiliates own at least 50% of common shares; that right declines to one candidate while ownership remains above 5%. OpenAI may designate one director while it and its controlled affiliates own at least 5%.

SBE intends to rely on some or all controlled-company exemptions, including those from having a majority-independent board and fully independent compensation and nominating/governance committees. Investors may therefore have fewer independence-related governance protections while SBE remains controlled. Audit-committee independence requirements still apply: at least one independent member upon listing, a majority within 90 days, and all members within one year. The board expects a three-member audit committee with an independent chair and plans to appoint an audit committee financial expert.

The board plans to establish audit, nominating and corporate governance, and compensation committees, with charters adopted around the offering. It also plans governance guidelines providing for a lead independent director to preside at periodic meetings of independent directors and act as liaison with the board chair. The board oversees risk management, focusing on strategy and significant risks and monitoring management’s mitigation efforts.

Directors will be elected annually until the Threshold Date. Thereafter, the board is to be divided into three classes with staggered three-year terms, so only one class is elected each year. The charter will require SoftBank’s prior written consent to increase or decrease board size after the Threshold Date, subject to the Shareholders’ Agreement. SBE cautions that a classified board may delay or prevent a change in control or management.

Compensation and policies

No compensation was paid to non-employee directors in FY2025, and the Co-CEOs receive no additional compensation for board service. SBE had no formal non-employee director compensation policy before the offering, but intends to adopt one providing for cash retainers and equity awards; employee directors will receive no additional director compensation.

Before the offering, SBE plans to adopt a code of business conduct and ethics covering directors, officers, employees, and senior financial officers. The board considers diversity among factors in evaluating director candidates but has no formal written diversity policy.

Executive compensation

Executive compensation

The company reported compensation for four named executive officers (NEOs) for FY2025. Cash bonuses were paid in March 2026. No directors received compensation for board service during FY2025; the Co-CEOs’ employee compensation is included below.

NEO Salary Bonus 401(k) match Total compensation
Rich Hossfeld, Co-CEO $547,000 $485,000 — $1.032M
Abhijeet Sathe, Co-CEO $547,000 $485,000 $14,000 $1.046M
Gaetan Frotte, CFO $425,862 $170,344 $14,000 $610,206
Ryan Bates, General Counsel $420,423 $147,115 $14,000 $581,538

Target annual bonuses are 80% of base salary for each Co-CEO, 40% for the CFO and 35% for the General Counsel. Performance measures include adjusted portfolio EBITDA, safety and project-development metrics. The compensation committee retains discretion over the Co-CEOs’ measures and awards; the Co-CEOs have that discretion for the CFO and General Counsel.

Management profits interests and employment protections

Under a plan adopted in connection with a July 2024 strategic transaction, 10 million Series C Profits Units were issued to a management aggregator. They represent a fixed 10% of Energy Global profits distributed after specified hurdles. Each NEO initially received an interest representing 20% of the management pool. Later grants to other employees diluted the NEOs’ pool percentages, and the filing says additional Profits Units were issued to the NEOs in connection with that dilution. These are profits interests, not traditional options: the grant threshold value was $0, and they have no option exercise price or expiration date.

Profits Units generally vest 20% on the first anniversary of the vesting start date and 5% on each of the next 12 quarterly anniversaries, up to 80%, subject to continued service. Unvested units accelerate in full upon a Valuation Event—expected to include the offering—if the NEO remains in service through its consummation. The units’ offering conversion and treatment were still being finalized; the company does not intend to issue more Profits Units under the 2024 Plan after the offering.

After termination without Cause or resignation for Good Reason, each Co-CEO may receive 12 months of base salary, a qualifying unpaid prior-year bonus and limited COBRA support. The CFO and General Counsel may receive three months of salary plus one month for each complete year of service, capped at six months, with COBRA support for the same period. These benefits are subject to a release and covenant compliance. Such a termination also accelerates Profits Units that would vest during the following year; other unvested units are forfeited. A termination for Cause forfeits all vested and unvested units. The filing also describes Good Reason as excluding a material diminution in duties, responsibilities or title, while covering specified material breaches by Partnership Group affiliates under other material agreements.

Anticipated 2026 equity plans

The board is expected to adopt a 2026 Long-Term Incentive Plan before the offering closes. It is intended to cover approximately 350 employees, including four executive officers, seven non-employee directors and 10 other service providers. Awards may include incentive and non-qualified options, stock appreciation rights, restricted stock, RSUs, performance awards and other cash- or stock-based awards. Options and SARs generally may have terms of up to 10 years, with exercise or grant prices generally no lower than grant-date fair market value. Awards are discretionary, and the compensation committee or plan administrator will determine recipients, terms, vesting and acceleration. Awards are subject to applicable clawback policies. The plan is expected to allow grants for 10 years after board approval; specified material amendments require shareholder approval, and impairments of existing award rights require affected holders’ written consent. Shares forfeited, cancelled, expired, cash-settled or withheld for taxes or option net exercise generally recycle into the reserve; assumed or substituted acquisition awards do not count against the aggregate limit.

The anticipated 2026 Employee Stock Purchase Plan (ESPP) would allow eligible regular employees, including executive officers, to contribute up to 15% of defined earnings, normally through payroll deductions. Offerings may last up to 27 months. Shares generally would be purchased at no more than 85% of the lower of fair market value on the first or last day of an offering. Annual purchases are capped at $25,000 of stock value, measured at the start of the offering; employees with at least 5% voting power or ownership by vote or value are ineligible. The company expects approximately 350 eligible employees, including four executive officers. The ESPP may include Section 423-qualified rights for eligible U.S. employees and non-423 offerings or subplans for foreign employees. Participation and actual share issuance will depend on future elections and awards. The company intends to register shares under the 2026 Plan and ESPP on Form S-8 after the offering.

The board may amend, suspend or terminate the ESPP, subject to applicable shareholder-approval requirements; outstanding participant rights generally cannot be materially adversely affected without written consent. Rights are nontransferable other than by will or inheritance and may be exercised only by the participant during their lifetime. The compensation committee may adjust plans for capital changes or determine treatment in a change of control.

The company described itself as an emerging growth company. It generally may receive a tax deduction when participants recognize ordinary compensation income, subject to tax-law limits; compensation above $1 million paid to Section 162(m) covered employees is generally nondeductible following elimination of the former performance-based compensation exception. The company intends to adopt a Nasdaq- and Dodd-Frank-compliant compensation recovery policy after the offering.

Principal shareholders

Principal shareholders and ownership methodology

The section is intended to report beneficial ownership before and after the offering for holders above 5%, named executive officers and directors, and the executive-officer/director group. The extracted table contains no share counts, ownership percentages, date, or group size, so ownership levels, concentration, and changes resulting from the offering cannot be quantified.

Ownership calculations reflect the stock split and exercises of OpenAI warrants. Post-offering ownership assumes the underwriters do not exercise their additional-share option. The table also gives effect to the Closing Distribution, treating distributed shares as held by Energy Global’s limited partners. Beneficial ownership includes shares a holder has the right to acquire now or within 60 days, solely for calculating that holder’s ownership.

The identified major holders are SB Energy HoldCo, LLC, SVF II Energy (DE) LLC, and Energy Global Management, LP. SB Energy HoldCo’s shares may also be deemed beneficially owned through its corporate ownership chain by SoftBank Group Corp. and related entities. SVF II Energy is held through a chain of SoftBank Vision Fund II entities; SoftBank Group Corp. is the sole shareholder of SB Global Advisers Limited, the appointed manager that makes final investment decisions. Rich Hossfeld and Abhijeet Sathe, managers of Energy Global Management, may share beneficial ownership of that entity’s shares.

These relationships indicate material ownership links to SoftBank and Energy Global, as well as potential shared beneficial ownership or control. The missing table data prevents assessing the size of those interests or the effect of the offering on ownership.

Description of certain indebtedness

Indebtedness and refinancing

As of September 30, 2026, consolidated indebtedness was approximately $4.6 billion of principal, or approximately $4.5 billion net of unamortized issuance costs and discounts. The debt described below is secured. Most is project-level debt owed by subsidiaries and non-recourse to SB Energy, Inc.; project lenders have first-priority claims on the relevant project assets. The company reported compliance with all financial and other debt covenants at that date.

Debt outstanding at September 30, 2026 Amount Key terms
Hickory Facilities $473.0 million Six-month Term SOFR + 3.75%; due October 18, 2027
Cosmos Senior Secured Notes $999.0 million principal 8.875% fixed; due May 1, 2031
Libra Facilities $1,096.3 million SOFR + 162.5 bps; maturity depends on term conversion and specified outside dates
Pelicans Jaw Facilities $874.8 million SOFR + 1.75%; expected term conversion by the earliest applicable conversion date, tax-equity final funding, or March 31, 2027
Athos Storage Facilities $361.9 million SOFR + 175 bps; maturity depends on term conversion and specified outside dates
Big Five senior loans $324.3 million SOFR + 2.00%; due January 29, 2034
Big Five mezzanine loans $100.0 million SOFR + 3.00%; due January 29, 2029, with bullet repayment
Orion 1 / Orion 2 / Orion 3 loans $83.2 million / $91.6 million / $94.7 million SOFR plus margins; due October 2029 / November 2034 / September 2029
Eiffel Term Loan $87.7 million Six-month Term SOFR + 1.75%; due December 6, 2033

Proposed corporate Credit Facility and related repayment

In connection with the offering, SB Energy, Inc. expects to become the direct borrower under a proposed $3.0 billion senior secured Credit Facility, comprising up to $1.875 billion of revolving commitments and a separate $1.125 billion letter-of-credit facility. Both are expected to mature 3.5 years after closing, with no scheduled amortization and the ability to reborrow repayments. Incremental commitments may include $500 million, plus additional amounts subject to a secured-net-leverage test. SOFR margins are 1.75%–2.25%, alternate-base-rate margins are 0.75%–1.25%, and the undrawn commitment fee is 0.375%.

SB Energy, Inc. and certain domestic restricted subsidiaries are expected to guarantee the facility, secured by first-priority liens on substantially all their personal property. Project, tax-equity and similar special-purpose entities are excluded, so the collateral covers only a limited portion of consolidated assets. Minimum quarterly liquidity is $600 million, stepping down to $400 million after a quarter in which credit-agreement cash flow available for debt service exceeds $1.0 billion; liquidity includes unrestricted cash and undrawn revolver commitments. Cash dividends are not expected to be permitted before January 1, 2029; thereafter, payments are subject to baskets and leverage tests, with unlimited dividends permitted if pro forma total net leverage is no more than 2.00x.

Effectiveness is conditional, among other things, on at least $3.0 billion of gross offering proceeds, completion of the Ares Redemption, and repayment of the Hickory Facilities. Hickory—owed by SE Global Borrower, LLC—is expected to be repaid using the initial Credit Facility borrowing, with related commitments terminated and liens and guarantees released. SB Energy, Inc. also had $709.5 million of intercompany notes payable to SBE Global, a direct obligation expected to be repaid with accrued interest before or substantially concurrently with the offering, using cash on hand, facility borrowings and/or other sources. The company expects to have sufficient cash to repay these notes even if the new facility is not entered into.

Project-financing details and risk

Libra’s construction and bridge facilities have approximately $2,446.3 million of commitments, plus a $98.0 million LC facility; approximately $772.6 million of swaps are in place at a weighted-average fixed rate of approximately 4.12%. Athos has approximately $679.4 million of commitments, plus a $78.0 million LC facility; a forward-starting swap covers approximately $215.0 million at 4.02%. Both facilities are borrower obligations and non-recourse to SB Energy, Inc. Their stated maturities depend on conversion and other specified events, with outside dates of March 31, 2028 for Libra and November 30, 2046 for Athos’s swap.

Pelicans Jaw has approximately $1,028.3 million of construction and bridge commitments plus a $72.3 million LC facility; forward-starting swaps cover $364.1 million at weighted-average fixed rates of approximately 4.20%. Hickory comprises a $263.0 million term loan, $262.0 million revolver and $475.0 million LC facility; swaps hedge $197.2 million at a weighted-average fixed rate of 3.76%. The Big Five facilities include swaps on $243.9 million of senior debt at 3.95% and $75.0 million of mezzanine debt at 3.93%. Eiffel’s $65.8 million swap fixes its rate at 3.45%; scheduled amortization is $1.6 million in 2026, $1.5 million in 2027, $1.4 million in 2028, $3.0 million in 2029, $4.6 million in 2030, and $77.4 million thereafter. Orion loans are secured by project assets; limited cash-diversion and ITC-delta guarantees apply to Orion 1 and 3.

The Cosmos Issuer issued $999.0 million principal of notes on May 7, 2026, at 99.500%, receiving approximately $994.0 million net proceeds and a 9.002% yield to maturity. Interest is paid semiannually. Proceeds repaid a $342.3 million bridge facility, funded Austin data-center construction and a debt-service reserve, and paid transaction costs. The notes are obligations solely of the Cosmos Issuer, secured by substantially all its assets, and are not guaranteed by SB Energy, Inc. or other subsidiaries. Energy Global, the indirect parent, provides an uncapped completion guaranty for the Cosmos Research Campus, but it does not guarantee repayment of the notes.

Although project debt is generally non-recourse to SB Energy, Inc., SBE US Holdings One, LLC provides limited, capped guarantees for specified project exposures; these generally terminate or reduce when milestones are met. Project lenders rank ahead of SB Energy, Inc.’s equity in their subsidiaries. Credit Facility lenders would have direct claims against SB Energy, Inc. and subsidiary guarantors but remain structurally subordinated to project creditors on project assets; collateral exclusions may also limit recovery. Public shareholders therefore rank behind corporate and project creditors and could lose their entire investment in an affected project after foreclosure. Most project debt remains SOFR-based despite portfolio-wide interest-rate swaps, leaving residual floating-rate exposure.

Description of capital stock

Capital structure and voting control

As of the July 10, 2026 Texas conversion, 19,966,564.08 common shares were outstanding, held by one record holder; no Class N common or preferred shares were outstanding. After the offering-related transactions, the company expects common shares to be held by multiple record holders and Class N shares by one record holder, with no preferred shares outstanding. The board may issue additional common shares without shareholder approval, subject to legal, charter, and exchange requirements.

Common shareholders have one vote per share, and there is no cumulative voting. SoftBank is expected to control a majority of voting power and therefore be able to elect all directors standing for election. Under the planned Shareholders’ Agreement, SoftBank’s director-candidate designation rights range from six candidates at 50% or greater ownership to one candidate above 5%. The agreement also provides proportional committee representation and, while SoftBank owns more than 50%, approval rights over committee composition. SoftBank receives preemptive, registration, consent, consultation, and other rights; OpenAI is also a party. Designated-candidate rights for SoftBank and OpenAI are exempt from the bylaws’ advance-notice and nomination procedures while the agreement remains effective.

Class N shares are generally economically equivalent to common shares, including dividend and liquidation rights, but are nonvoting except as required by Texas law. A holder may convert each Class N share into one common share with at least 60 days’ prior notice; conversion is automatic on transfer to a non-affiliate. Class N shares will be issued through the concurrent private placement and settlement of the prepaid forward contract.

The 2.253942 million unvested OpenAI Warrants will remain outstanding after the offering and become exercisable only upon satisfaction of vesting conditions. Vested warrants, including those vesting upon the offering, will be net exercised in connection with it. The exercise price is $0.01 per share; the number of shares issued on net exercise depends on common-stock value at exercise.

Dividends, issuance, and transfer restrictions

The company does not expect to pay cash dividends in the foreseeable future, intending to retain available funds and future earnings for operations and expansion. As a holding company, it can pay dividends only from subsidiary distributions. The Credit Facility prohibits cash dividends before January 1, 2029; afterward, dividends remain subject to conditions. Texas law also limits distributions to legally available funds and generally requires sufficient surplus without rendering the corporation insolvent.

The board may issue preferred stock without further shareholder action, subject to applicable law and exchange rules, and establish its voting, dividend, redemption, conversion, and liquidation terms. Such issuance could dilute common voting power, restrict common dividends, subordinate common liquidation rights, depress the share price, or deter an acquisition. Authorized but unissued common, Class N, and preferred shares may also be used for other issuances; Nasdaq approval is required for certain issuances representing at least 20% of outstanding voting power or common shares.

The charter restricts certain transfers under the company’s PUHCA/FERC-regulated utility structure. Without board consent, a transfer is restricted if the holder and FERC affiliates would reach the 10% Utility Control Threshold or obtain rights to appoint a non-independent director. Affected transfers may be ineffective and confer no shareholder rights; separate FERC authorization or an applicable blanket authorization may also be required. These limits may constrain investors seeking significant stakes or voting influence.

Registration rights and control provisions

SoftBank, NVIDIA, and OpenAI will have demand and shelf-registration rights and customary piggyback rights on pari passu terms. Registered resales could make substantial numbers of shares freely tradable and pressure the public-market price; the company bears most registration expenses.

Texas law generally restricts specified business combinations with a shareholder owning 20% or more for three years, absent specified prior board approval or a later two-thirds vote of disinterested shareholders. Shareholders may remove directors by majority vote, but removal of SoftBank- or OpenAI-designated directors requires the relevant sponsor’s prior written consent.

Before the Threshold Date, holders of at least 20% of voting power may call a special meeting; afterward, the threshold becomes 25% or the highest percentage permitted under Texas law. The board, chair, or president may also call special meetings, and only business stated in the meeting notice may be conducted. Shareholder nominations and proposals generally require notice 90–120 days before the prior annual meeting’s anniversary. After listing, the company expects to adopt Texas Business Organizations Code Section 21.373 proposal requirements, including qualifying ownership (the lesser of $1 million in market value or 3% of voting shares), six months’ continuous ownership, ownership through the meeting, and solicitation of holders representing at least 67% of voting power. Rule 14a-8 proposal rights remain preserved.

Before the Threshold Date, shareholders may act by written consent with the voting power required to act at a meeting; afterward, written consent requires unanimity of all holders entitled to vote. Amending the bylaws requires at least 66⅔% of voting power, and certain charter amendments require a two-thirds vote. While Class N shares remain outstanding, changes to their rights also require approval by a majority of that class voting separately. These and other charter and bylaw provisions may impede shareholder action or proxy contests, deter takeover proposals, and delay or prevent a change of control.

Litigation, conflicts, and shareholder remedies

Most internal corporate disputes must be brought in the Texas Business Court, Third Business Court Division, with specified Texas state or federal courts as fallback forums. Securities Act claims are assigned to federal district court; Exchange Act claims are excluded from the exclusive-forum provision. The charter also waives jury trials for internal-entity and other covered claims. Enforceability and scope—particularly for federal securities claims—remain uncertain, and the company intends to enforce the provisions to the fullest extent permitted by law.

The company and its subsidiaries renounce claims to “Covered Opportunities” presented to or developed by directors, officers, board observers or attendees, SoftBank and its affiliates, and OpenAI and its affiliates, unless expressly offered in writing to an individual solely in that person’s company-director or officer capacity. These parties may pursue opportunities independently, compete, deal with the company’s customers or suppliers, and hire its employees without presenting opportunities to the company.

The charter generally eliminates directors’ and officers’ monetary liability for fiduciary-duty breaches to the extent permitted by Texas law, subject to exceptions such as loyalty breaches, bad faith or intentional misconduct, knowing legal violations, improper personal benefits, and statutory liabilities. The company will indemnify and advance expenses to directors and officers to the fullest extent permitted, has separate indemnification agreements with directors and executive officers, and may maintain D&O insurance. The bylaws require at least 3% ownership to bring a derivative claim. The company has elected into TBOC Section 21.419, which presumes directors and officers acted in good faith, on an informed basis, in the corporation’s interests, and lawfully; claims generally require rebutting that presumption and proving fraud, intentional misconduct, an ultra vires act, or a knowing violation of law. The company expects the provision to apply following the offering and says it should reduce unwarranted litigation. No material indemnification-related litigation or proceeding is pending.

Subject to Texas-law exceptions, shareholders may seek appraisal in specified mergers, certain sales of substantially all assets, interest exchanges, and conversions, with fair value agreed with the company or determined by a Texas court. The company has applied to list its common stock on Nasdaq and Nasdaq Texas under ticker SBE.

Shares eligible for future sale

Shares Eligible for Future Sale

No public market existed for the company’s common stock before the offering. The company applied to list its shares on Nasdaq and Nasdaq Texas, but cautions that an active trading market may not develop. Substantial future sales—or the market’s expectation of such sales—could put downward pressure on the share price.

Shares sold in the offering are generally freely tradable, except those held by affiliates, which remain subject to Rule 144 restrictions. The company’s other outstanding shares, including shares distributed to Energy Global limited partners in the Closing Distribution, are restricted securities and are not eligible for immediate resale when the offering is completed. Some may become eligible after the 180-day lock-up expires, subject to applicable Rule 144 or Rule 701 conditions; the lock-up may also be waived or terminated early. Other restricted shares may become eligible as their holding periods expire, and registration rights could permit earlier sales once shares are registered.

NVIDIA’s Class N shares issued in the Concurrent Private Placement and delivered upon settlement of the Prepaid Forward Contract are restricted, subject to lock-ups, and resalable only under an effective registration statement or an available exemption. Each Class N share converts one-for-one into common stock. Shares underlying unvested OpenAI warrants are not outstanding unless and until the warrants are exercised, but could result in future share issuance and dilution.

Registration rights may create significant market overhang by enabling a large number of shares to be sold once registered. The company intends to file Form S-8 registration statements shortly after the prospectus covering shares issued or issuable under its 2026 Plan and employee stock purchase plan. Such registration would facilitate public resales by non-affiliates; affiliate sales would remain subject to Rule 144.

General resale timing

  • Rule 701 compensatory-plan shares: Generally become eligible for sale 90 days after the registration statement becomes effective.
  • Rule 144 affiliates: Generally may begin reselling 90 days after effectiveness. In any three-month period, sales are limited to the greater of 1% of outstanding common shares or the average weekly trading volume during the preceding four weeks, and are subject to current-public-information, manner-of-sale and notice requirements.
  • Rule 144 non-affiliates: May generally resell after six months, subject to current-public-information requirements, and after one year without Rule 144 restrictions.

Material u s federal income tax considerations f

Material U.S. Federal Income Tax Considerations for Non-U.S. Holders

The company does not anticipate paying dividends on its common stock in the foreseeable future. If it makes a distribution, the portion treated as a dividend generally is subject to 30% U.S. withholding tax on the gross amount, unless a tax treaty reduces the rate and the holder provides valid documentation. A distribution exceeding the company’s earnings and profits generally first reduces the holder’s tax basis; any excess is treated as capital gain.

Dividends that are effectively connected with a non-U.S. holder’s U.S. trade or business generally are exempt from the dividend withholding tax if properly documented, but are taxed on a net-income basis at regular U.S. rates. A corporate holder may also owe a 30% branch profits tax, subject to possible treaty reductions.

A non-U.S. holder’s gain from selling or otherwise disposing of the shares generally is not subject to U.S. federal income tax, except when the gain is effectively connected with a U.S. trade or business; an individual holder is present in the United States for 183 days or more during the tax year and other requirements are met; or the shares are treated as a U.S. real property interest because the company is a U.S. real property holding corporation (USRPHC).

The company believes it currently is not a USRPHC, but gives no assurance that it will remain so. USRPHC status depends on the relative fair market values of the company’s U.S. real property interests, non-U.S. real property interests, and other business assets. Even if the company is a USRPHC, a holder owning 5% or less may avoid U.S. tax on a disposition if the shares are regularly traded on an established securities market and the applicable ownership and holding-period conditions are satisfied.

FATCA may impose 30% withholding on dividends paid to certain non-U.S. financial institutions and non-financial foreign entities unless applicable due-diligence, reporting, ownership-disclosure, or exemption requirements are met. Proposed Treasury regulations eliminate FATCA withholding on gross sale proceeds; taxpayers generally may rely on those regulations until final regulations are issued.

Dividends and certain proceeds from sales connected with the United States may be subject to information reporting. Backup withholding generally can be avoided by certifying non-U.S. status or otherwise establishing an exemption. Backup withholding is not an additional tax and may be credited against, or refunded as part of, a holder’s tax liability.

This discussion is limited to specified non-U.S. holders that hold shares as capital assets. It does not cover numerous special categories of holders or other taxes, including estate, gift, state, local, non-U.S., Medicare net-investment-income, and minimum taxes. The discussion is based on current authorities, which may change or be interpreted differently, potentially with retroactive effect. The company has not sought and will not seek IRS rulings on these tax matters.

Underwriting

Underwriting and offering terms

SBE agreed to sell the offered common shares to the underwriters on a firm-commitment basis: if they purchase any shares, they must purchase all shares offered. If an underwriter defaults, the remaining underwriters may assume additional commitments or the offering may be terminated. J.P. Morgan Securities, Goldman Sachs and Morgan Stanley are the joint book-running managers and representatives. The underwriters have a 30-day option to buy additional shares from SBE, on the same terms and in approximately the same proportions as the base offering, to cover over-allotments.

SBE applied to list its common stock on Nasdaq and Nasdaq Texas under “SBE.” There was no prior public market; the IPO price will be negotiated with the underwriters. The filing cautions that an active market may not develop and that shares may trade below the IPO price.

At SBE’s request, up to 5% of the offered shares may be reserved at the IPO price for directors, officers, certain employees and other associated individuals. Shares not purchased through the program return to the public offering, while purchases reduce the shares available to other investors.

Lock-ups and potential trading supply

SBE is subject to a 180-day post-prospectus lock-up restricting share and convertible-security issuances, sales, hedges and related transactions without written consent from the underwriter representatives. Directors, executive officers and substantially all shareholders are also subject to 180-day restrictions. Exceptions include certain gifts and estate-planning or affiliate transfers, equity-award exercises and settlements, conversions of existing securities and qualifying change-of-control transactions; transferred securities generally remain subject to the lock-up.

SoftBank, NVIDIA and their affiliates may pledge shares in bona fide financing transactions. If lenders enforce a pledge during the lock-up period, purchasers must agree to remain locked up for the remainder of that period. The underwriters may release locked-up securities in whole or in part at their discretion. Certain releases for other holders can trigger pro rata releases for SoftBank, OpenAI and NVIDIA, potentially increasing tradable supply. Some transfers require recipients to sign lock-ups and restrict voluntary public disclosures of ownership changes during the restricted period.

Stabilization, conflicts and distribution

The underwriters may use stabilization activities—including short sales, open-market purchases, covering positions and penalty bids—that could support or raise the share price above the level that otherwise would prevail. These activities may end at any time; underwriters may establish naked short positions if they anticipate downward price pressure.

Underwriters and their affiliates have provided, and may continue to provide, banking, advisory and investment-banking services for customary fees. Some are also lenders, arrangers or agents under SBE credit facilities and project financings, creating potential conflicts of interest.

The offering includes public offerings in Japan and the United Kingdom, but SBE does not intend to list in either market. Offers and resales in other jurisdictions are subject to local securities laws and investor-eligibility and disclosure restrictions. In Singapore, Hong Kong, Taiwan, the DIFC, UAE, ADGM and Brazil, offers are limited to eligible institutional, accredited or professional investors under applicable rules. In Brazil, eligible investors must purchase through a non-Brazilian account, settle outside Brazil in a non-Brazilian currency, and may not trade the shares on regulated Brazilian markets. The filing also warns that shares offered in the DIFC and ADGM may be illiquid or subject to resale restrictions.

Concurrent private placement and prepaid forward

NVIDIA prepaid forward and concurrent private placement

On August 17, 2026, Energy Global entered into a prepaid forward contract with NVIDIA. NVIDIA prepaid $1.500 billion to Energy Global, which contributed the proceeds to the company. At or immediately before the IPO closing, the contract will settle in Class N common shares calculated by dividing $1.500 billion by 90% of the IPO price per share—effectively an issuance price 10% below the IPO price. The company irrevocably agreed to issue the equity or make the cash payments needed to meet its settlement obligations. The Class N shares are convertible one-for-one into common stock, subject to customary anti-dilution adjustments and ownership restrictions; the contract terminates when the shares are delivered.

Separately, at the IPO closing, NVIDIA will invest another $1.500 billion in a concurrent private placement of Class N shares priced at the IPO price before underwriting discounts and expenses. The share count will equal $1.500 billion divided by the IPO price, rounded down to a whole share, with the purchase price reduced for the fractional share. The company receives the full placement price and pays no underwriting discounts or commissions on these shares.

NVIDIA’s aggregate investment through the prepaid forward and private placement will be $3.000 billion. The exact share counts cannot be determined until the IPO price is set. Both issuances are exempt from registration and are not registered in the IPO; the shares will be restricted securities subject to customary legends and applicable lock-up arrangements. The transactions therefore add potential dilution, while limiting near-term transferability of NVIDIA’s shares.

Experts

Experts

Deloitte & Touche LLP audited the financial statements of SB Energy, Inc. and its subsidiaries (formerly SE Global Holdings, Inc.) as of December 31, 2025 and 2024, and for each of the two years ended December 31, 2025. The prospectus includes those statements in reliance on Deloitte’s audit report. This section does not describe the audit opinion or report any control issues.

Where you can find more information

Where to Find More Information

The company has filed an S-1 registration statement with the SEC. The prospectus is incomplete without the full registration statement and its exhibits.

After the offering closes, the company will be subject to the Exchange Act’s reporting requirements and will file periodic reports, proxy statements, and other information with the SEC. It plans to make these materials available on its website as soon as reasonably practicable after filing or furnishing them to the SEC. The website’s contents are not incorporated into the prospectus.

Financial statements

SB Energy, Inc. — FY2025 financial statements and related developments

Consolidated results

FY ended December 31 FY2025 FY2024
Revenue $213.467M $232.243M
Cost of operations, excluding depreciation, amortization and accretion $81.393M $55.213M
Depreciation, amortization and accretion $94.080M $73.314M
General and administrative expense $679.566M $169.095M
Stock-based compensation, included in G&A $674.051M $140.307M
Operating loss $(641.572)M $(65.379)M
Interest expense $162.392M $127.554M
Interest income $14.638M $18.964M
Consolidated net loss $(788.092)M $(204.051)M
Net income (loss) attributable to SB Energy $(738.008)M $106.104M
Net cash used in operating activities $(40.049)M $(65.871)M
Cash purchases of property, plant and equipment $1.092981B $601.195M
Weighted-average basic and diluted units 19.966564M 19.966564M

Revenue declined 8.1%, primarily because derivative revenue fell to $70.486M from $131.691M. FY2025 derivative revenue included $63.300M of net unrealized gains and $7.186M of realized gains, compared with $119.300M and $12.391M, respectively, in FY2024. Customer-contract revenue increased to $142.981M from $100.552M, including energy revenue of $125.830M from $87.454M and REC revenue of $17.151M from $13.098M. Power-swap fair-value changes and settlements are recorded in revenue without hedge accounting, so reported revenue reflects market and forward-price movements as well as delivered power.

The sharp increase in G&A—and the resulting GAAP loss—was driven primarily by parent-level profit-unit compensation. Series C profit-unit expense was $607.841M in FY2025, versus none in FY2024; these liability-classified awards are remeasured using Level 3 valuation inputs. At year-end, 8.317445M Series C units were unvested, with $1.767B of unrecognized compensation expected to be recognized over a weighted-average 2.6 years. These are parent-level awards, not SB Energy membership units. The FY2024-to-FY2025 change in attributable income also reflects the substantial FY2024 loss attributable to noncontrolling interests.

Segments and significant reconciliation items

Segment Revenue FY2025 Revenue FY2024 Segment Adjusted EBITDA FY2025 Segment Adjusted EBITDA FY2024
Standalone Power (SP) $213.467M $232.243M $97.678M $80.661M
Data Centers (DC) $0 $0 $0 $0
Solutions (SLN) $0 external; $62.366M intersegment $0 external; $25.715M intersegment $22.256M $(12.031)M
Total Segment Adjusted EBITDA — — $119.934M $68.630M

SP’s external revenue was entirely U.S.-based; DC was pre-revenue in both years. SP’s segment costs increased to $65.969M from $48.524M, while its unrealized power-swap gain was lower. SLN costs were $42.179M versus $37.746M. Significant items in the segment-to-consolidated results reconciliation included stock-based compensation of $674.051M (prior year $140.307M), net interest expense of $147.754M ($108.590M), unallocated overhead of $26.043M ($18.415M), pre-operating expenses of $7.586M ($5.099M), and an unrealized swap gain of $63.300M ($119.300M). FY2025 segment other items included $15.200M from termination of Holville lease options.

Cash flows, balance sheet and funding

Balance-sheet item Dec. 31, 2025 Dec. 31, 2024
Total assets $5.582564B $4.275206B
Total liabilities $3.985819B $2.522407B
Total equity, including noncontrolling interests $1.592693B $1.746788B
Member’s equity $1.170389B $1.249865B
Goodwill $10.993M $0
Other intangible assets, excluding goodwill $18.496M $16.496M
Net property, plant and equipment $4.863079B $3.362240B
Construction in progress $1.8924B $353.25M
Cash and restricted cash $218.713M $574.178M

Capital investment substantially expanded the asset base, particularly construction in progress; operating cash flow remained negative despite improving year over year, and cash and restricted cash declined about 61.9%. Year-end cash comprised $131.857M unrestricted and $86.856M restricted. Restricted funds are held for purposes including debt service, construction costs, taxes and other contractual requirements. FY2025 investing cash outflow was $1.194998B; financing provided $879.582M, including $670.100M of debt proceeds, $299.520M of related-party debt proceeds and $496.571M of cash capital contributions, partly offset by $538.447M of capital distributions. Noncash PP&E additions included in payables and accrued expenses rose to $722.393M from $147.007M.

Debt, commitments and exposure

At December 31, 2025, debt principal was $2.168117B, compared with $1.521000B a year earlier; net debt carrying value was $2.103453B versus $1.456640B. Related-party debt from the parent, bearing 6% annual interest, was a further $709.520M, up from $410.000M. The resulting reported debt balances—including related-party debt—totaled $2.812973B. Scheduled principal repayments include $1.168378B in 2027, a substantial refinancing concentration. Most listed project debt bears floating SOFR-based rates; the company reported compliance with financial covenants at year-end.

Letters of credit used increased to $684.880M from $415.233M, and surety bonds to $170.591M from $80.699M. Firm construction commitments totaled $2.312840B through 2028. More than 60% of derivative assets were concentrated with one lender, and supplier advances generally lack collateral. Customer concentration was also significant: Customer D accounted for 29% of FY2025 revenue (16% in FY2024); Customers A, B and C represented 16%, 13% and 10%, respectively.

Subsequent developments

After year-end, the company signed OpenAI-affiliated tenant agreements for two planned data-center buildings totaling approximately 753 MW of critical IT capacity, with 15-year initial terms and two 10-year extension options; the leases had not commenced by the financial statements’ issuance date. In 2026, SB Energy received $1.340B of parent contributions. SE Cosmos issued $999.000M of 8.875% senior secured notes due 2031, refinancing its bridge borrowing. New Libra and Athos project financings included $2.446292B and $679.400M of loan commitments, respectively. FY2025 financial statements received an unqualified audit opinion; the auditor did not audit internal control over financial reporting.

Financial statements

SB Energy, Inc. — Q1 2026 financial statements

Q1 2026 results are restated. Dollar amounts are in millions unless stated otherwise.

Consolidated results

Q1 income statement Q1 2026 Q1 2025
Revenue $44.073 $30.661
Cost of operations 19.183 18.769
Depreciation, amortization and accretion 23.591 23.450
General and administrative expense 126.029 46.173
Operating loss (124.730) (57.731)
Interest expense (55.963) (58.495)
Interest income 1.506 4.887
Consolidated net loss (131.155) (100.600)
Net loss attributable to SB Energy (151.927) (73.878)
Basic and diluted loss per unit $(7.61) $(3.70)

Revenue grew 43.7%. Energy revenue was $24.294 million (up from $21.300 million), REC revenue was $3.092 million (up from $2.446 million), and total customer-contract revenue was $27.386 million (up from $23.746 million). Derivative revenue more than doubled to $16.687 million from $6.915 million, including $13.477 million of net unrealized gains versus $3.500 million and $3.210 million of realized gains versus $3.415 million. Thus, mark-to-market activity was a substantial contributor to revenue growth. A $52.477 million gain from the change in warrant-liability fair value partly offset the operating loss; there was no comparable prior-year gain.

Segments and reconciliation

Segment External revenue Q1 2026 External revenue Q1 2025 Segment Adjusted EBITDA Q1 2026 Segment Adjusted EBITDA Q1 2025
Standalone Power (SP) $44.073 $30.661 $15.351 $26.294
Solutions (SLN) — — 14.350 (5.855)
Data Centers (DC) — — — —
Total $44.073 $30.661 $29.701 $20.439

SLN generated $29.134 million of intersegment revenue versus $4.424 million, eliminated in consolidation; DC remained pre-revenue. SP’s EBITDA declined in part because of unrealized power-swap changes, a $13.477 million loss versus a $3.500 million loss. SLN’s prior-year result included a $15.2 million Holville release payment; Q1 2026 other items included test-power proceeds eliminated on consolidation.

Items reconciling segment EBITDA to consolidated results Q1 2026 Q1 2025
Interest expense, net $54.457 $53.608
Stock-based compensation 122.081 35.758
Depreciation, amortization and accretion 23.591 23.450
Unallocated overhead 5.360 6.054
Gain from change in warrant-liability fair value (52.477) —

Stock-based compensation rose sharply, including $105.639 million for liability-classified 2024 Series C Profit Units versus $19.316 million a year earlier. At quarter-end, 7,922,680 Series C units remained unvested, with $1.661 billion of unrecognized compensation expected over a weighted-average 2.4 years. Another 352,420 Common A Profit Units were unvested, with $85.708 million of unrecognized compensation expected over 0.5 years.

Cash flow and investment

Cash flow and capital spending Q1 2026 Q1 2025
Net cash used in operating activities $(70.903) $(58.354)
Cash PP&E payments (capital expenditures) 742.954 137.173
Additions to PP&E in accounts payable/accrued expenses (noncash) 338.244 176.841
Net cash used in investing activities (746.898) (146.640)
Net cash provided by/(used in) financing activities 805.441 (28.811)
Ending cash, cash equivalents and restricted cash 206.353 340.373

Q1 financing included $696.600 million of debt proceeds and $222.898 million of financing-obligation proceeds, partly offset by $196.205 million of debt repayments and $76.370 million of deferred financing-cost payments. Cash contributions were $166.000 million versus $495.000 million. Restated noncash parent contributions were $1.567 billion versus $33.239 million. Cash, cash equivalents and restricted cash decreased $12.360 million in Q1 2026; cash interest paid was $38.723 million versus $30.407 million.

Balance sheet and funding

Balance-sheet item March 31, 2026 December 31, 2025
Total assets $11.170B $5.583B
Total liabilities 7.979B 3.986B
Total member’s equity 2.751B 1.170B
Noncontrolling interests 437.183 422.304
Total equity 3.188B 1.593B
Goodwill 10.993 10.993
Intangible assets other than goodwill 18.496 18.496
Total debt principal 2.669B 2.168B
Debt, net 2.538B 2.103B

Total equity less goodwill and other intangible assets was $3.158 billion at March 31. The asset increase included a $4.603 billion deferred lease incentive and net PP&E growth to $5.681 billion from $4.863 billion. Construction in progress rose to $2.572 billion from $1.892 billion. Cash and cash equivalents were $78.834 million versus $131.857 million; restricted cash was $127.519 million versus $86.856 million. Prepaids and other current assets rose to $182.017 million, including $138.768 million of EPC prepayments. Debt, net, comprised $926.329 million current and $1.612 billion non-current; $709.520 million was related-party debt. The company reported covenant compliance, including minimum-liquidity and debt-service-coverage requirements. Variable-rate debt is primarily SOFR-based.

Units outstanding were 19,966,564 at both the beginning and end of Q1; the January split was an in-substance recapitalization. Parent-level warrants and incentive awards are not convertible into SB Energy units and are excluded from diluted units.

Restatement, warrants and commitments

The restatement corrected valuation inputs reflecting warrant participation terms. The previously reported March 31 warrant liability was understated by $753.050 million; the deferred lease incentive at lease inception was understated by $957.232 million. Restated liabilities increased by $753.207 million, total assets increased by $957.232 million, and member’s equity increased by $204.025 million. Q1 net loss was revised from $137.651 million to $131.155 million, and loss per unit from $7.93 to $7.61; operating cash used was unchanged.

On January 9, SB Energy issued OpenAI-affiliated OAI 8.5546 million milestone-vesting warrants, liability-classified and valued at $4.603478 billion at issuance. At March 31 their Level 3 fair value was $3.620286 billion ($1.632533 billion current and $1.987753 billion non-current). The Q1 rollforward included $930.715 million of settlements, treated as a capital contribution, and a $52.477 million fair-value gain. The warrants’ $4.603478 billion cost was recorded as a lease incentive, to reduce revenue when related sales-type leases commence. Valuation used a Monte Carlo/option-pricing approach; key quarter-end assumptions included $30.703526 billion parent equity value, 20% volatility, a 4.2% risk-free rate and a 9.8-year term. Unvested warrants included 1,216,507 with milestones considered probable and 6,469,159 whose conditions were not considered probable or depended on a qualified public offering.

Firm construction commitments for the remainder of 2026 through 2028 totaled $5.382761 billion. Letters of credit used rose to $1.134782 billion from $684.880 million, and surety bonds to $294.524 million from $170.591 million. Interconnection performance obligations drove a major LC increase; PPA collateral was $546.079 million. Related-party parent debt comprised approximately $410.000 million at 7.3% and $299.520 million at 6.0%.

Projects, strategy and risks

SB Energy is developing utility-scale energy projects and data centers. Two Milam County data centers leased to an OpenAI affiliate are designed for about 308 MW and 445 MW of critical IT capacity; their 15-year triple-net leases had not commenced, so no lease income was recognized. The related Cosmos lease has estimated undiscounted payments of $2.183 billion over 15 years, with a 10-year renewal option. Q1 also included new Libra and Athos Storage construction/bridge facilities with $2.446 billion and $679.400 million of loan commitments, respectively.

After quarter-end, SE Cosmos received a $342.250 million bridge draw and, on May 7, issued $999 million principal amount of 8.875% senior secured notes due 2031. Energy Global contributed $1.340 billion to SB Energy in May and June for data-center infrastructure, renewable development, debt repayment and working capital. The company also reported $134.290 million of Class A tax-equity contributions for Pelicans Jaw TE Holdco.

Counterparty exposure is notable: more than 49% of derivative assets were concentrated with one lender, and the largest generally unsecured supplier advance was approximately $34.088 million. Four SP customers represented 70% of Q1 revenue. The company had $206.353 million at financial institutions, above FDIC-insured limits. Cosmos and Orion data-center leases remained under construction. Management expected probable but immaterial losses from an ERCOT investigation and a CARB emissions-reporting matter.

Financial statements

SB Energy — Q2 and H1 2026 financial statements

Unaudited interim financial statements were restated. Amounts are in millions unless stated otherwise.

Consolidated results

($M, except per-unit data) Q2 2026 Q2 2025 H1 2026 H1 2025
Revenue 94.586 52.661 138.659 83.322
General and administrative expense 475.478 131.634 601.507 177.807
Operating loss (426.875) (122.811) (551.604) (180.542)
Loss on warrant-liability fair-value change (2,692.421) — (2,639.944) —
Consolidated net loss (3,128) (155.246) (3,259) (255.846)
Net loss attributable to SB Energy (3,124) (141.652) (3,276) (215.530)
Basic and diluted loss per unit $(156.45) $(7.09) $(164.06) $(10.79)

Revenue increased 79.5% in Q2 and 66.4% in H1, but the growth primarily reflected derivative gains rather than customer-contract revenue.

Revenue stream ($M) Q2 2026 Q2 2025 H1 2026 H1 2025
Energy 26.171 32.632 50.465 53.932
Renewable energy credits 4.500 5.421 7.592 7.867
Data-center rent 0.653 — 0.653 —
Customer-contract revenue 31.324 38.053 58.710 61.799
Derivative revenue 63.262 14.608 79.949 21.523
Total revenue 94.586 52.661 138.659 83.322

Derivative revenue included unrealized gains of $53.893M in Q2 and $67.370M in H1, alongside realized gains of $9.369M and $12.579M, respectively. Customer-contract revenue declined 17.7% in Q2 and 5.0% in H1. No lease income was recognized from the OpenAI data-center arrangements because construction was ongoing and leases had not commenced.

Segments

Segment and measure ($M) Q2 2026 Q2 2025 H1 2026 H1 2025
DC revenue 0.653 — 0.653 —
DC adjusted EBITDA 0.034 — 0.034 —
SP revenue 93.933 52.661 138.006 83.322
SP adjusted EBITDA 23.915 27.757 39.266 54.051
SLN intersegment revenue 23.676 9.801 52.810 14.225
SLN adjusted EBITDA 8.749 (0.611) 23.099 (6.466)
Total segment adjusted EBITDA 32.698 27.146 62.399 47.585

SLN revenue is intersegment and eliminated in consolidated revenue. Segment EBITDA growth was more than offset in reported results by warrant remeasurement and substantially higher incentive compensation.

Cash flow and balance sheet

H1 cash flow ($M) H1 2026 H1 2025
Operating cash flow (55.597) (46.254)
PP&E cash expenditures (1,672) (357.455)

Operating cash flow less PP&E expenditures was approximately negative $1.728B. Financing provided $3.759B, including $2.396B of debt proceeds and $1.905B of capital contributions; debt repayments were $538.594M. Cash interest paid rose to $78.198M from $49.331M.

Balance sheet ($M) June 30, 2026 Dec. 31, 2025
Total assets 14,479 5,583
Total liabilities 12,235 3,986
Total equity, including noncontrolling interests 2,241 1,593
Goodwill 10.993 —
Other intangible assets, excluding goodwill 18.496 —
Cash and cash equivalents plus restricted cash 2,216 218.713
Net PP&E 6,841 4,863

PP&E expansion included $3.722B of construction in progress. Other intangible assets included a $16.496M conservation-easement intangible. Debt principal was $4.026B; debt carrying value, net of discounts and issuance costs, was $3.892B, plus $709.520M of related-party debt. Cash and restricted cash were not fully FDIC-insured. More than 45% of interest-rate-swap derivative assets were concentrated with one lender.

Restatement, warrants and compensation

The restatement corrected warrant valuation inputs. It increased the June warrant liability by $826.590M and the deferred lease incentive by $957.232M; contributed capital rose $197.530M. H1 net loss increased by $66.888M, while operating cash flow was unchanged. The H1 noncash warrant fair-value loss was $2.640B. At June 30, total warrant liabilities were $6.313B, classified as current ($2.384B) and noncurrent ($3.928B); the liabilities are Level 3 and their remeasurement drove much of the reported loss.

H1 stock-based compensation expense was $589.503M, versus $162.462M, and total plan compensation expense was $467.422M in Q2 and $589.503M in H1. Unrecognized Series C compensation was $2.344B, expected to be recognized over a weighted-average 2.2 years; 7,634,815 Series C units remained unvested. The January 2026 unit split retrospectively increased the unit count to 19.966564M. Parent-level warrants and incentive awards are not convertible into SB Energy units.

Projects, obligations and funding

The company paid $174.000M toward Libra’s $291.672M purchase price; $65.000M remains contingent on a commercial-operation milestone. It completed the $285.622M Cosmos property acquisition in March. The company reported $6.259B of firm construction commitments through 2028, $1.142B of letters of credit used, and $267.448M of surety bonds.

Cosmos and Milam County data-center leases with an OpenAI affiliate are expected to begin in phases from H2 2026 through 2028. The planned Milam County facilities total 753 MW of critical IT capacity. The related warrant-created lease incentive of $4.603B is to reduce revenue after lease commencement. Separately, 17 twenty-year OpenAI leases were signed for the planned PORTS-Pike campus in Ohio, with phased operations expected from 2028. NVIDIA’s conditional residual-value guarantee covers the initial 4.25 GW-IT and has an aggregate remedy cap of $105B across related guarantees.

In August 2026, NVIDIA invested $1.500B through a prepaid forward contract with Energy Global, with proceeds contributed to SB Energy; settlement may involve equity issued at 90% of the IPO price or cash. The filing also describes Texas and California regulatory investigations, each assessed as likely to result in an immaterial loss.

Financial statements

SB Energy — financial statements and operating performance

SB Energy develops, constructs, owns and operates U.S. utility-scale solar, storage and data-center projects. The nine months ended September 30, 2026 reflect rapid project investment and financing, alongside earnings dominated by noncash fair-value movements rather than operating results.

Consolidated results

$M, except where noted Q3 2026 Q3 2025 9M 2026 9M 2025
Revenue 38.443 80.743 177.102 164.065
Operating loss (27.022) (178.662) (578.626) (359.204)
Net income (loss), consolidated 1,359.571 (225.883) (1,899.581) (481.729)
Net income (loss) attributable to SB Energy 1,362.059 (224.474) (1,913.701) (440.004)

Revenue fell 52.4% in Q3 but increased 7.95% for 9M. The contrasting trends reflect volatile derivative revenue: Q3 included a $12.690M derivative loss versus $29.825M revenue a year earlier, while 9M derivative revenue increased to $67.259M from $51.348M. Customer-contract revenue was comparatively stable: $51.133M versus $50.918M in Q3 and $109.843M versus $112.717M in 9M.

Revenue category ($M) Q3 2026 Q3 2025 9M 2026 9M 2025
Energy 45.352 45.028 95.817 98.960
Renewable energy certificates 4.404 5.890 11.996 13.757
Data-center rentals 1.377 — 2.030 —
Derivatives (12.690) 29.825 67.259 51.348

A $1.437130B Q3 warrant-liability remeasurement gain drove the quarterly profit swing; for 9M, warrant remeasurement instead produced a $1.202814B loss. The prepaid-forward liability added a $166.667M loss in Q3 and 9M. These noncash changes substantially obscure operating performance. G&A was $17.409M in Q3 versus $215.757M, but rose to $618.916M for 9M from $393.564M. Stock-based compensation expense was $4.123M in Q3 versus $208.723M and $593.626M for 9M versus $371.186M.

Segment performance

Segment ($M) Q3 2026 revenue Q3 2025 Q3 2026 Adjusted EBITDA Q3 2025 9M 2026 revenue 9M 2025 9M 2026 Adjusted EBITDA 9M 2025
Data Centers (DC) 1.377 — 0.030 — 2.030 — 0.064 —
Standalone Power (SP) 37.066 80.743 35.841 30.852 175.072 164.065 75.107 84.903
Solutions (SLN) 31.535 7.747 13.814 (2.967) 84.345 21.972 36.913 (9.433)
Total Segment Adjusted EBITDA — — 49.685 27.885 — — 112.084 75.470

SLN revenue was entirely intersegment and eliminated from consolidated revenue. SP’s Q3 EBITDA improved, but 9M EBITDA declined; management cited power-price swap effects, including a $58.959M unrealized loss in 9M 2026 versus a $44.451M loss in 9M 2025. DC remained pre-revenue in 9M 2025.

Cash flow and investment

9M cash flow ($M) 2026 2025
Operating cash flow (77.388) (104.684)
PP&E purchases (capital expenditures) (3,603.600) (688.479)

Supplier advances were $535.895M versus $12.573M, contributing to investing cash use of $4.1395B versus $709.023M. Financing provided $6.1504B versus $506.147M, including $2.9965B debt proceeds, $2.3021B capital contributions and $1.500B prepaid-forward proceeds. Cash and restricted cash ended 9M at $2.1522B, up from $218.713M at the start of the period. Cash interest paid was $118.497M versus $88.990M.

Balance sheet ($M) Sep. 30, 2026 Dec. 31, 2025
Total assets 14,606 5,582.6
Cash and cash equivalents 996.652 131.857
Restricted cash 1,155.6 86.856
PP&E, net 8,294.4 4,863.1
Total liabilities 10,683 3,985.8
Total equity, including noncontrolling interests 3,919.9 —
Goodwill 10.993 10.993
Intangible assets other than goodwill 18.496 18.496

Total equity comprised $3.3899B of member’s equity and $530.0M of noncontrolling interests; accumulated deficit was $2.5078B. Construction in progress grew to $5.095B from $1.892B, while PP&E additions and $624.732M of engineering, procurement and construction prepayments drove the investment buildout. Units outstanding were 19,966,564 at both the start of 9M and September 30; the January unit split was reflected retrospectively.

Financing, commitments and risks

Debt principal rose to $4.623B from $2.168B; debt, net of issuance costs and discount, was $4.507B, including $1.223B current and $3.285B noncurrent, plus $709.520M of related-party debt. New project financing included $999.000M of 8.875% Cosmos senior secured notes due 2031, $1.096B of Libra construction and bridge loans, $361.850M of Athos Storage loans and $874.750M of Pelicans Jaw loans. Several facilities use floating SOFR-based rates; the company reported compliance with minimum-liquidity and debt-service-coverage covenants.

Firm construction commitments totaled $6.790959B through 2028. Letters of credit used increased to $1.198782B from $684.880M, and surety bonds to $378.119M from $170.591M. Unsecured supplier advances create counterparty exposure; the largest was approximately $213.010M. More than 39% of interest-rate-swap derivative assets were concentrated with one lender.

Large data-center leases had not commenced by September 30, 2026. Cosmos is expected to come online in phases from November 2026; Milam County buildings from 2027–2028; and PORTS-Pike from 2028–2032. Cosmos has estimated undiscounted lease payments of approximately $2.475B, with a SoftBank affiliate guarantee carrying anticipated maximum aggregate exposure of approximately $2.905B. Milam’s two buildings are designed for approximately 308 MW and 445 MW of critical IT capacity. NVIDIA guarantees specified OpenAI tenant obligations for PORTS covering the initial 4.25 GW; the aggregate remedy cap is $105.0B, and NVIDIA may elect to extend guarantees to an additional estimated 3.78 GW.

Energy Global, LP contributed $1.5B of NVIDIA prepaid-forward proceeds to SB Energy. The liability was valued at $1.666667B at September 30, reflecting settlement in a variable number of Class N shares priced at 90% of the IPO price; no shares had yet been delivered. An additional approximately $1.5B NVIDIA stock purchase after a qualifying IPO remained subject to conditions. The OpenAI warrants were amended in August: 4.562791M of the original 8.5546M warrants were cancelled, leaving 3.991809M liability-classified warrants subject to fair-value remeasurement. The $2.347068B ending warrant liability and Level 3 assumptions contribute substantial earnings volatility.

Liquidity depends partly on obtaining additional construction financing for a data-center project due within 12 months and on planned IPO proceeds. Energy Global guarantees completion, landlord improvements and project-life payments if the deadline is missed. Management judged it probable the company can meet obligations and continue operations for 12 months from issuance, but financing availability, timing and terms remain uncertain. Subsequent events were evaluated through November 19, 2026.