Southern Copper Corporation 8-K

PositiveEarnings

Higher metal prices drove record earnings despite lower copper sales volumes and weaker production at Peruvian mines.

Filed 2026-07-21 20:51 ET

Summary

Q2 2026 results and quarterly dividend. Southern Copper reported record quarterly sales, net income attributable to SCC and adjusted EBITDA, driven mainly by higher metal prices; copper sales volumes and several by-product production measures declined. The board authorized a cash and stock dividend totaling an estimated $3.23 per share.

Key Figures

Metric Q2 2026 Q2 2025 Y/Y
Net sales $4.29B $3.05B 40.6%
Operating income $2.62B $1.59B 65.3%
Net income attributable to SCC $1.67B $973M 71.6%
Adjusted EBITDA, non-GAAP $2.86B $1.79B 59.5%
Diluted EPS attributable to SCC common shareholders $2.01 $1.17 71.8%
Operating cash flow $1.99B $977M 104%
  • Six-month net sales were $8.54B (+38.4% Y/Y), net income attributable to SCC was $3.25B (+69.2%), adjusted EBITDA was $5.57B (+57.5%), and operating cash flow was $3.68B (+116.9%). Higher metal prices drove sales growth; the company also cited strong operating cash generation and a $718.5M decrease in operating assets and liabilities requirements. Q2 net income margin rose 700 bp Y/Y to 38.9%; adjusted EBITDA margin rose 790 bp to 66.6%.
  • Mined copper production fell 3.5% Q/Q to 230,662 tonnes, with Peruvian mines down 12.0% Q/Q; six-month mined copper production declined 3.8% Y/Y, mainly due to lower ore grades in Peru. Q2 mined zinc and molybdenum production fell 14.5% and 11.0% Y/Y, respectively.
  • Capital investments were $422.8M in Q2 (+79.4% Y/Y) and $864.7M for the first six months (+56.2%). At 6/30/2026, cash was $5.67B and long-term debt was $7.99B, vs $4.30B and $6.75B at 12/31/2025. The company issued $1.25B principal amount of 10-year fixed-rate senior unsecured notes, bearing 5.350% and due 2036; proceeds are for SPCC’s Tía María development, capital expenditures and general corporate purposes. The authorized dividend is $1.10 cash plus 0.0120 shares per share, estimated at $3.23 per share in total, payable 8/27/2026 to holders of record 8/11/2026.

Guidance

No guidance in this filing.

Investor Takeaways

  • Tía María was 42% complete at 6/30/2026; watch for equipment assembly in 2027 and the planned start of production in 2H27. The project is designed to produce 120,000 tonnes of refined copper annually.
  • Los Chancas progress remains hindered by illegal miners, with operations planned for 2031. Michiquillay is expected to begin production in 2032, with planned annual copper output of approximately 225,000 tonnes.